Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Technician
-
Site Location
-
Distribution Board Designation
-
Engage pump techs to run pumps at Average Flow Rates (75%)
-
Record Current on A phase
-
Record Current on B phase
-
Record Current on C phase
-
Engage pump techs to run pumps at Max Flow Rates (100%)
-
Record Current on A phase
-
Record Current on B phase
-
Record Current on C phase
-
Engage pump techs to run pumps at Mid Flow Rates (50%)
-
Record Current on A phase
-
Record Current on B phase
-
Record Current on C phase
-
Record Power Factor