Title Page
-
Site conducted
-
Document No.
-
Conducted on
-
1500 Dublin Ave Winnipeg MB R3E 3R5 Canada
-
Shift
-
Inspector
ITPs / Logs
INSPECTION TEST PLANS (ITPs)
-
GIRDER BUILD: Have you audited ITPs?
-
Reason why ITPs not audited
-
Are the ITPs filled out and up to date?
-
PHOTO MANDATORY of ITP not filled out (proof).
-
Details of Project/Part #
-
GIRDER DRESS (ASSEMBLY): Have you audited ITPs?
-
Reason why ITPs not audited
-
Are the ITPs filled out and up to date?
-
PHOTO MANDATORY of ITP not filled out (proof).
-
Details of Project/Part #
-
PROGRESSIVE ASSEMBLY: Have you audited ITPs?
-
Reason why ITPs not audited
-
Are the ITPs filled out and up to date?
-
PHOTO MANDATORY of ITP not filled out (proof).
-
Details of Project/Part #
-
STRUCTURAL / SPECIALIZED LOGS: Have you audited structural ITPs?
-
Reason why ITPs not audited
-
Are ITPs filled out and up to date?
-
PHOTO MANDATORY of log not filled out (proof).
-
Details of Project/Part #
-
GIRDER SUB-COMPONENT ASSEMBLY AREAS (i.e. gussets): Have you audited Misc. Logs?
-
Reason why logs not audited
-
Are the systems for sub-components in control? *items organized, tagged for identification, QC verified etc.?
-
Are logs filled out and up to date?
-
PHOTO MANDATORY of logs not filled out (proof).
-
Details of Project/Part #
QC PRODUCTION INSPECTION LOGS
-
Have Camber Logs been updated?
-
Reason why Camber Logs not updated
-
Have NDT/Heat Tracking Logs been updated?
-
Reason why NDT Logs not updated
-
Have Stud Logs been updated?
-
Reason why Stud Logs not updated
-
Have Bearing Flatness Logs been updated?
-
Reason why Bearing Flatness Logs not updated
-
Have Splice Logs been updated?
-
Reason why Splice Logs not updated
-
Have Hardness Checks been updated (if required)?
-
Reason why Hardness logs not updated
-
Has the Wheel-Abrator Log been reviewed?
-
Reason why Wheel-Abrator log not updated
Paint Shop
-
Has the Paint Plant Ambient Condition Monthly Log been updated?
-
Describe Details of findings
-
Have Coating Inspection Forms been updated?
-
Describe Details of findings
-
Has the Coating Repair Form been updated?
-
Describe Details of findings
-
Has the Weekly Maintenance Checklist been updated?
-
Describe Details of findings
Processing / Cutlists
Drawings
-
Are operators using drawings as reference to what they are cutting?
-
Are operators checking parts that are cut for issues?
Koike
-
Have all cutlist info been verified prior to dry-run? (plate dimensions, heat number, torch distance etc.)
-
Dry-Runs verified? (camber, centered to plate etc.)
-
Have the markings on plates cut been verified?
-
Have the cutlists been verified and signed off by both operator and QC? (before and after cut)
Gemini
-
Have First-Offs been complete? (part dimensions, hole size etc. verified before cutting full plate)
-
Have parts from each corner of the plates cut been verified?
-
Have the cutlists been signed and verified? (including the outstanding cutlists at the podium)
Victory
-
Have pop-marks prior to each new program been verified?
-
Have the cutlists been signed and verified?
Python
-
Have parts cut/drilled been verified?
-
Have the cutlists been verified and signed?
Angle Line
-
Have parts cut/drilled been verified?
-
Have the cutlists been verified and signed?
Saw
-
Have cut parts been verified?
-
Have cutlists been verified and signed?
Mill (Pontiac/Butler/Footburt)
-
Have parts at mill been verified?
-
Have cutlists been verified and signed?
Issues
Report Issues
-
Are there any issues to report?
Issues to Report
-
Project #
-
Mark #
-
Action Required?
-
Severity
-
Non-Conforming Department
- Detailing
- PPC
- QC
- Miscellaneous
- Processing
- Bridge
- Progressive
- Structural
- Paint
- Yard
-
# of parts affected
-
Details
-
Description of Root Cause (if known)
-
Initial Report Date
-
Photos
PlanGrid
-
Have all issues been recorded into PlanGrid, including pictures and details?
-
Note
Communication
-
Have issues or concerns been communicated to appropriate audience?
QC Communication
Inspections
-
Were any inspections completed?
Inspection Completed
-
Project #
-
Mark #
-
Details
-
Initial Report Date
-
Photos
Layouts
-
Were any total station layouts completed
-
Which layout was completed?
-
Does this still require QC verification?
Risks
-
Is there any risk needs to be communicated
-
Describe the risk
Daily Tasks
Walkthrough
-
Has the daily shop walkthrough been performed at the beginning of shift?
-
Note
Shop Photos
-
Are you responsible for taking shop photos? *remember to turn off ‘Live Photos’
-
Upload shop photos on the network and iCloud
Welding Parameters
-
Have all welds been performed by ticketed welders?
-
Describe Details of findings
-
Have all pre-heat requirements been met?
-
Describe Details of findings
Signature
Sign
-
Inspector's Signature