Information
-
Qinterra Technologies Field Specialist Review
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Basic Field Operations
-
Is the employee familiar with wireline operations onshore & offshore
-
Is the employee aware that he/she has the RIGHT to shut down a unsafe operation
-
Is employee aware of the potential dangers associated with oilfield operations
-
Has the employee identified the hazards and held the mandatory JSA with all involved in the operation before operation commences
-
Has employee been issued with correct PPE
-
Comments
-
Pictures
Required Certification
-
DOT Medical
-
Rigpass
-
First Aid/CPR
-
Well Control
-
H2S
-
All OSHA annuals: Access to employee medical records, bloodborne pathogens, electrical safety, fall protection, heat stress, lock out-tag out, PPE, right to know, explosive awareness
-
All required eLearnings: Caring for the enviroment, corporate resposibility, just care, office HSE, Well Intervention Services, stress management
-
All other annuals: Behavioral based safety, continual risk assesment, incident accident reporting, JSA training, fatigue management
-
Pictures
DOT Compliance
-
Has employee updated DOT Log book or EOBR
-
Has employee sent/submitted all logs to admin for filing
Technical Knowledge
Electrical Knowledge
-
Does the employee have any electrical background
-
Is employee aware of the dangers associated with high voltage/current
-
Is employee familiar with Qinterra Technologies electrical test meters and calibrations
-
Can employee demonstrate the use of the test meters when operating/testing Qinterra Technologies equipment
-
Is employee comfortable installing PSP power supply cable into the 480v junction box
-
Can employee demonstrate the proper electrical checkout of a wireline cable
-
Comments:
-
Pictures
Explosive Operations
-
Is employee fully aware of the hazards associated with oilfield explosives
-
Does employee have a good understanding of API RP67
-
Does employee understand the term EBBA and explain & who is in charge of the explosive device
-
Can employee determine the correct VPM for the explosive device and explain
-
Comments
-
Pictures
Radioactive Operations
-
Does employee have any knowledge with regards to radioactive operations
-
Does the employee know the importance of Time, Distance & Shielding when radioactive operations are being performed
-
Is the employee aware of the importance of doing before and after background surveys using the correct survey meter when handling radioactive material
-
Comments:
Pressure Control Equipment
-
Does employee have any knowledge of pressure control equipment (PCE)
-
Does employee know the importance of pressure testing wellhead equipment
-
Comments:
Fishing Operations Cased Hole - Open Hole
-
Does employee have any knowledge of oilfield fishing operations
-
Has employee ever been involved in any type of oilfield fishing operation
-
Comments:
Job Preperation
Pre-Job Shop Checks
-
Has equipment been assigned and all asset numbers been given to Asset Manager
-
Did employee perform a Cerberus model for the operation
-
Did employee fill PTA with the correct hydraulic oil as per oil selection sheet
-
Was primary & back-up equipment checked on a appropriate wireline
-
Did employee check both tools using the PowerTrac software on his/her company supplied PC
-
Has employee filled out ALL appropriate checklists/PM sheets and submitted to Asset Manager
-
Has employee submitted a problem report if a problem was found
-
Comments:
Pre-Job Meeting
-
Did employee attend the Pre-Job meeting before departing the facility
-
During the Pre-Job meeting was journey management discussed and documented
-
Was any issues or concerns brought up at the meeting
-
Did employee finalize all required documentation before departing the facility
-
Was a service order number issued during the Pre-Job meeting
-
Comments:
Arrival At Location
-
Did employee introduce himself/herself to Company Representative on location
-
Did employee get the Company Representative to sign the Work Authorization form
-
Did employee introduce himself/herself to the Wireline provider on location
-
Did employee and ALL involved in the operation take part in a MANDATORY JSA/Toolbox Talk before commencement of operation & JSA document signed off
-
Comments:
Pre-Job Wellsite Checks
-
Did employee check all third party interface connections
-
Did employee electrically check third party wireline for insulation and continuity
-
Has all Qinterra Technologies units been grounded to the wellhead and checked with a meter
-
Did employee attach the ground cable to the tool before applying power to tool
-
Has employee checked all equipment including back up during this time
-
Has employee set the PTA compensator as per procedure
-
Was Wireline company able to confirm communication to there tools thru the PTA
-
Has employee filled out appropriate checklists and save in job packet
-
Comments:
Rig-Up
-
Is the unit spotted in a Safe Area using a spotter and wheels choked
-
During any crane operations was good visual and oral communication kept between crew and crane operator
-
Was PTA picked up to the wellhead inside the lubricator or with approved certified lift clamp
-
Has all electrical cables, pressure hoses been identified secured and roped off
-
Was wellhead pressure tested after installation of the lubricator
-
Has all shackles, sheave wheels, tie down points have safety pins attached
-
Comments:
Run In Hole To Tractor Depth
-
Has good communication been set up between Qinterra Technologies and Wireline provider
-
Has employee presented the hoist operator with a print out of the Qinterra Technologies hoist procedure and discussed requirements
-
Has employee informed Wireline provider not to exceed a running in hole speed of 150ft/50m per minute
-
Has hoist operator noted RIH and POOH weights and compared to Cerberus model
-
Has employee maintained speed and tension as per procedure when running the PTA
-
Does employee know the dangers of connecting/disconnecting the slip ring cable, this should only be done by Qinterra Technologies employees
-
Comments:
Pull Tool Out Of The Hole
-
Has employee advised hoist operator not to exceed 150ft/50m per minute when POOH
-
Has area been roped off and all relevant personnel made aware that the tool is coming back to surface
-
Has all procedures been followed by wireline company if using explosives or radiation
-
Was wellhead pressure bled off of the lubricator before removing lubricator
-
Was PTA laid down inside the lubricator or with the use of approved certified clamp
-
Comments:
Before Departing Location
-
Has employee ensured that all Qinterra Technologies equipment is cleaned and PM,d as procedure
-
Has employee ensured that PTA has been flushed and topped off with hydraulic oil
-
Has employee met with Company Rep and had service order signed, crew performance completed and any issues disscussed
Arrival At Qinterra Technologies Facility
-
Has employee informed Operations Manager that he/she is departing location
-
Has employee offloaded the equipment and prepped for maintenance
-
Has employee cleaned and serviced all equipment and vehicles ready for the next operation
-
Has employee finalized the job packet and given all relevant documentation to Operations Manager
-
Has employee submitted electronic copy of job packet to the G:drive
-
Comments:
Additional Comments
-
Auditor Comments:
-
Employee Comments:
-
Auditor Signature
-
Employee Signature