  • Hospital Name

  • Select date

  • Area

  • Switchboard/DB Name

  • Said Number

  • Prepared by

  • Image of Closed DB or Switchboard

  • Image of opened DB or Switchboard

  • Is there a wiring diagram present in the switchboard?

  • Are you in a switch room?

  • Check all clearances around switchboard.

  • Ensure exits are appropriately signed and that there is clear access to & from exit doors.

  • Is there Effective Ventilation?

  • Vacuum Switch room

  • Are there Switchboard cubicles?

  • Check effectiveness of the ventilation

  • Clean or replace filters

  • Open and/or remove all doors, access panels, cable covers, escutcheon panels etc and carry out the following work

  • Image/s with escutcheon panels opened

  • Check General condition of conduits, connectors, switches and wiring

  • Ensure all items of equipment are operational

  • Where present check & clean contacts or relays

  • Do overload ratings match motor nameplate ratings

  • Are fuses correctly rated, tight and in good condition

  • Inspect connections at motors, switchboard and equipment that is subject to vibration. Re-tighten terminations as necessary

  • Are interpole barriers and shrouds in good working order

  • Inspect insulation for signs of deterioration or cracking

  • Inspect for any evidence of dampness or condensation

  • Where applicable check operation of any heater and inspect any anti condensation finishes for signs of deterioration

  • Check for smells that might indicate overloading or deterioration of equipment/components

  • Check for noises that might indicate electrical discharge, tracking or looseness of components or equipment that requires servicing e.g contractors

  • Inspect switch gear, controls, cabling, bus bars etc for dust build-up, signs of overheating/loose connections and general condition of equipment

  • If surge diverter's are fitted ensure at minimum 50% life remaining

  • Check any penetrations in the switchboard are sealed.

  • Check for rodents/pest infestation. Treat & clean as required.

  • Check continuity to earth

  • Check and record neutral current

  • Vacuum clean the switchboard interior and remove any rubbish

  • Close and/or reinstall doors, access panels, cable covers, escutcheon panels etc once internal clean & inspect is completed. Ensure all fixings for panels are installed and securely tightened and that all labeling is still intact.

  • Where fitted check indicator lamps and replace as required.

  • Check for signs of corrosion and/or condition of paint, door locking handles/levers, hinges and cable access points

  • Check door & panel seal

  • Clean all external surfaces of switchboards to remove any dust.

  • Are there Meters Fitted?

  • Record all meter Instantaneous readings

  • Record Maximum demand values and date

  • Reset Maximum demand values.

  • List any non conformance's and recommendations in the field below

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.