Title Page

  • Site conducted

  • Site Name:

  • Asset reference number

  • Conducted on

  • Assessor

  • Location

QPWS CONDITION ASSESSMENT S3 LOOKOUT platform/on ground (note: use 1 assessment per structure)

  • 96fc7b40-8a3c-11e8-a530-8d83b5fa8e0a.png

Substructure

  • Footings (eg: undercutting erosion, concrete cracking, movement, not visible) - Specified Condition = 3

  • Retaining/abutments (e.g. rot, rust, splitting, movement, not visible for inspection) - Specified Condition = 3

  • Subframe (bearers, joists, bracing, posts, stirrups, anchors e.g. rot, rust, splitting, movement, not visible for inspection) - Specified Condition = 3.5

Superstructure

  • Handrail/midrail/balustrade/ posts/toerail (e.g. rot, splintering, rust, movement, cable tension, chain wire used) - Specified Condition = 3.5

  • Decking (e.g. rot, splintering, rust, protruding fixings, warping, loose boards) - Specified Condition = 3.5

  • On ground surface (concrete, paved, asphalt, stabilised deco etc.) - Specified Condition = 3

  • Stair tread/stringer (e.g. rot, splintering, rust, protruding fixings, warping, loose boards, uneven risers) - Specified Condition = 3.5

Furniture & fittings

  • Seating etc. (e.g. rot, splintering, rust, protruding fixings, warping, loose boards) - Specified Condition = 3

  • Brackets & fasteners (connector plates, bolts, etc. e.g. rust, lack of washers, movement, rusted triple grips, not as specified) - Specified Condition = 3.5

  • Electrical (eg: lighting, power etc.) - Specified Condition = 3.5

Finishes

  • Protective finish (timber preservative, oil, galvanising, powder coat, paint e.g. blistering, cracking, lack of applied finish) - Specified Condition = 3

CRITICAL INFRASTRUCTURE SPECIFIC QUESTIONS:

  • Have site conditions altered the structures effective fall height (heff)?

  • fall height diagram.png
  • In Metres, what is the current heff ? "Effective Fall Height (heff) shall be calculated from the following: heff = hf + hi where: hf = maximum actual fall height within a distance of 2 metres from the edge of structure (see illustration left) hi = the impact surface value (Extract from AS 2156.2-2001)"

GENERAL SITE CONDITIONS (including vegetation encroachment, drainage; site stability e.g. slip planes, rock fracturing etc.)

  • Description

OTHER NOTES/LIMITATIONS/SERIOUS HAZARDS (e.g. vegetation restricts access or views, trees against structure, vandalism, doesn’t match original drawings, elements obscured attach additional notes if not enough space):

  • Description

  • Task list (Condition based maintenance)
  • Asset Elements

  • Sub element

  • Sub element

  • Sub element

  • Sub element

  • Defect description

  • Task description (Note, include any specific location notes)

  • Task scope (i.e. Area/quantity involved; type of materials; service provider type required etc.)

  • Priority (1-4)

  • (A,S,E) Risk Type: the area of risk created by the defect. A = the asset, S = health and safety, E = the environment

  • Indicative Price (ex GST)

Engineering

  • Engineering or other higher level inspections required ?

  • Signature
  • Sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.