Information

  • Report No.

  • Audit Title Construction Quality Report

  • Client / Site

  • Conducted on

  • Prepared by Construction Quality Manager (CQM)

  • Location Quantico VA
  • Personnel

Contract No. N40080-12-C-1237 N40080-12-C-1238 N40080-12-C-1239

Contract Title. Advanced Metering Infrastructure (AMI)

  • Date Of Inspection

Preparatory Phase

  • Was Preparatory Phase Work Performed Today?

  • Definable Feature Of Work

Initial Phase

  • Was Initial Phase Work Performed Today?

  • Definable Feature Of Work

Follow-up Phase

  • Work Complies With Contract As Approved During Inital Phase

  • Work Complies With Safety Requirement

  • Description Of Work

  • Definable Feature Of Work

Photos Of Job Site

  • Photos Of Conduit For Gas Meter If Installed.

  • Photos Of Gas Meter If Installed.

  • Photos Of Conduit For Water Meter If Installed.

  • Photos Of Water Meter If Installed.

  • Photos Of Conduit For Comms If Installed.

  • Photos Of E-Meter If Installed.

Rework Items Identified Today (Not Corrected By Close Of Business)

  • Description

  • Photos Of Rework Items Today.

  • Site Supervisor

Rework Items Corrected Today (From Rework Items List)

  • Description

  • Photos Of Rework Items Corrected Today.

Remarks (Also Explain Any Follow-up Phase Checklist Item From Above That Was Answered "NO"). Manuf. Rep On-Site, ect.

  • Description

  • Authorized QC Manager At Site

Government Quality Assurance Report

  • Description

  • Government Quality Assurance Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.