Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre-Slab Box & Wrap Inspection

  • Underground excavations back-filled Re-compacted and free of vegetation or foreign materials

  • All form boards are neat , clean and will provide smooth finish

  • Pre construction Termite Treatment (Termiticide Pesticide) has been applied to the entire slab & footings. Stand pipe is tagged accordingly.

  • Minimum of 6Mil Polyethylene Vapor Retarder has been installed according to specification & taped appropriately

  • PT cables & tendons properly tied and supported on chairs no less than 3" from the top of soil or vapor barrier

  • Footer free of debris, spoils, water or any other such contaminants

  • Any direct slab penetrations are wrapped (3) layers or .50" on plumbing stacks

  • The width & depth of Spread footers, matt's & pier footings have been verified , and are installed per plan

  • All horizontal reinforcements are installed and supported with chairs, ladders or tied appropriately.

  • All Vertical reinforcements are installed and tied per plan

  • Installation meets or exceeds Kautaq Quality Control standars

  • Add media

  • Add media

Conclusion

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.