Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Underground plumbing pre-inspection

  • Does layout appear to meet plans & specifications

  • Are all laterals below FP

  • Are pipes shaded with joints exposed for inspector

  • If caps are glued have burp screws been installed

  • If performing water pressure test has 10' riser been installed and topped off with water

  • From the top of the invert to FF this measurement is @ or near 42"

  • Have all direct slab penetrations Been wrapped (3 layers)

  • Are any leaks present or visible

  • If 3" (or less Diameter)ABS is used is slope at least .25" per ' or 2%

  • Installation meets or exceeds Kautaq Quality Control Standards

  • Add media

  • Add media

  • All deficiencies (if noted) in this report have been addressed , remedied or otherwise no longer exist.

Conclusion

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.