Daily Main production Audit
Tool box check sheet- Main production (once at a random time during shift)
-
Has the paperwork been completed and correctly?
- 1 -Red unacceptable, stop line immedietely
- 2- Amber Acceptable however changes must be made immediately to make the product green
- 3 -Green no further action is neccessary
-
Are all knives,test pieces,scissors signed out if in use?
-
Is there any items reported missing?
-
Has all damage been reported to technical department and recorded?
-
Comments / Actions required
Daily GMP Main production (once at a random time in each area)
-
Is all staff wearing PPE correctly?
-
Are there any foreign body hazards present?
-
Is the area clean & tidy?
-
Door closed if not in use?
-
Any temporary fixes present?
-
All raw materials fully covered?
Main production line paperwork's
-
CCP checks, line start up, Hourly checks and Salt test completed and correctly?
warehouse
Tool box check sheet- Main production (once at a random time during shift)
-
Has the paperwork been completed and correctly?
-
Are all knives,test pieces,scissors signed out if in use?
-
Is there any items reported missing?
-
Has all damage been reported to technical department and recorded?
-
Comments / Actions required
Daily GMP Main production (once at a random time in each area)
-
Is all staff wearing PPE correctly?
-
Are there any foreign body hazards present?
-
Is the area clean & tidy?
-
Door closed if not in use?
-
Any temporary fixes present?
-
All raw materials fully covered?
Main production line paperwork's
-
CCP checks, line start up, Hourly checks and Salt test completed and correctly?
Line 22 and Line 21
Tool box check sheet- Main production (once at a random time during shift)
-
Has the paperwork been completed and correctly?
-
Are all knives,test pieces,scissors signed out if in use?
-
Is there any items reported missing?
-
Has all damage been reported to technical department and recorded?
-
Comments / Actions required
Daily GMP Main production (once at a random time in each area)
-
Is all staff wearing PPE correctly?
-
Are there any foreign body hazards present?
-
Is the area clean & tidy?
-
Door closed if not in use?
-
Any temporary fixes present?
-
All raw materials fully covered?
Main production line paperwork's
-
CCP checks, line start up, Hourly checks and Salt test completed and correctly?