Information
Inspection detail
-
Client:
-
House Name / Location of Inspection
-
Conducted on
-
Inspection completed by
-
Confirmation of Location (GPS)
Signature
Section 1 - Property inspection
Internal common areas (Housekeeping, building fabric, signage, heating / cooling, security)
-
Tick to add inspection record
-
Entrance / Reception<br>
-
Ground floor
-
1st floor
-
2nd floor
-
3rd floor
-
4th floor
-
5th Floor
-
6th Floor
-
7th Floor
-
8th Floor
-
9th Floor
-
10th Floor
-
11th Floor
-
12th Floor
-
13th Floor
-
14th Floor
-
15th Floor
-
16th Floor
Additional floors
-
Floor
-
Condition
-
Risers secure and free of waste material
-
Welfare facilities (common areas)
-
Lifts
-
Staircases
-
Escape routes (including final exits)
-
Basement corridors
-
Plant areas
-
Bin / waste storage areas (internal - including compactors)
Another Location
-
Area / location
-
Condition
Unoccupied commercial / retail areas
-
Tick to add area inspected
-
Floor / location
-
Condition
Another location
-
Area / location
-
Condition
Roof
-
Tick to add detail of roof inspection
-
Access secure with with warning / information signage in place
-
Strict operation of fall arrest system evident
-
'Safe' walkways clearly demarcated
-
Edge protection in visibly good condition
-
Fragile surfaces clearly marked
-
Adequate lighting and wayfinding
-
Adequate emergency warning information ( signage, sounded, beacons etc.)
-
General condition
Property exterior and structure
-
-
Structural condition
-
Guttering and downpipes
-
Drainage
-
Lighting
-
Exits, entrances and emergency provisions clear
-
Paving / pathways
-
Staircases / steps
-
Bin / waste storage areas (external - including compactors)
-
Gates / barriers
-
Boundary walls and fences
-
Roadways and traffic routes
-
Signage and road markings
-
Car parking facilities
-
General cleanliness / litter
-
Trees and landscaping
Another Location
-
Area / location
-
Condition
Hazards noted in tenant demise
-
Tick to add hazard
-
Area / location
-
Condition
Another Location
-
Area / location
-
Condition
Hazards relating to Neighbouring property / shared areas
-
Tick to add area inspected
-
Area / location
-
Condition
Another Location
-
Area / location
-
Condition
Section 2 Unoccupied premise inspection
Exterior inspection
Interior inspection
Section 3 - Management system information
Daily / weekly / monthly checks
-
Daily task - security / property check
-
Daily task - fire suppression system operation check
-
Weekly task - fire alarm test
-
Weekly task - lift alarm / phone check
-
Weekly task - sprinkler flow valve test
-
Weekly task - water outlet flushing regime
-
Monthly task - emergency lighting test
-
Monthly task - final exit door check
-
Monthly task - water temperature checks ( domestic system)
-
Weekly task - water outlet flushing regime
Site documentation / procedure
-
Current insurance certificate in place
-
Fire emergency information available and up to date
-
Disaster recovery procedures in place and up to date (Must be available at manned sites)
-
Asbestos register available and up to date
-
Sign in / out register in use for visitors and contractors
-
Visitor h&s information displayed
-
Property hazard form available and up to date
-
Risk assessments for all on site staff activity sufficient and in place
-
Risk register in place and includes all significant hazards
-
First aid kit readily available and fully stocked
-
All site accidents reported on central online portal
Section 4 - Quarterly tasks
-
Quarter 1: Jan -Mar
Contractor audit - Engineering / Maintenance
-
Main contractor reviewed
-
Participants (contractor)
-
Are routine checks being carried out in plant areas
-
Are PPMs up to date
-
Are risk assessments available for all maintenance activities
-
Is there sufficient evidence that risk assessments / method statements are being followed
-
Are training records up to date for all maintenance personnel
-
Is there adequate evidence of control of subcontractors
-
Are sign in / out and permit to work processes being followed
-
Are sufficient critical spares available on site
Topic focus - PPE
-
Is there a PPE register and is it up to date
-
Is there an adequate documented inspection regime in place
-
Is there sufficient evidence that PPE is being used correctly and is effective
-
Has appropriate training /information about the use of PPE been made available.
Topic focus - Electrical safety
-
Is a suitable fixed wiring test program in place and up to date
-
Have all P1 and P2 recommendations been completed or instructed
-
Is proof of competency (NECEIC or equivalent) available for all electrical contractors
-
Is access to electrical risers and switch rooms adequately secure?
-
I'd there adequate evidence of control of electrical works (PTW / isolation procedures etc.)
-
Is a suitable PAT and labelling program in place
-
Are all on site staff aware of the checks that should be carried out before using portable electrical equipment
Topic focus - mobile / Portable work equipment (towers, lifting equipment etc)
-
Is there an adequate inspection and maintenance program in place
-
Is there sufficient evidence that the maintenance inspection regime is effective
-
Are risk assessments and method statements available for the use of all equipment
-
Are operating instructions / procedures available for all equipment
-
Are the storage arrangements for equipment and accessories acceptable
-
Have PPE requirements been identified and implemented
-
Quarter 2: Apr - Jun
Contractor audit - Security
-
Main contractor reviewed
-
Participants (contractor)
-
Are site instructions in place and up to date
-
Is an activity log maintained and up to date
-
Can on site-staff demonstrate sufficient awareness of sign in / out procedures
-
Can on site-staff demonstrate sufficient awareness of contractor control and permit to work procedures
-
Can on-site staff demonstrate sufficient awareness of emergency procedures
-
Are all officers displaying their SIA licence
-
Are daily walk rounds being completed and logged
Topic focus - Fire
-
Are all maintenance records up to date
-
Is the operations manual and emergency information up to date
-
Are there any unauthorised system isolations or excessive isolations
-
Are any current system faults known and being addressed
-
Is there a currently fire risk assessment with all actions addressed or in progress
-
Have any significant changes occurred which may require a revision to the fire risk assessment
-
Have copies of tenant fire risk assessments been provided and are they up to date
Topic focus - Training
-
Have the training requirements for all site activities been identified
-
Are records for all Client / BPSEM site staff available and up to date (inc. FM / EM)
-
Are records of contractor training available and up to date
-
Quarter 3: Jul - Sep
Topic Focus - Water hygiene
-
Is there a current legionella risk assessment and are all actions complete or in progress
-
Are all daily / weekly checks giving results within acceptable parameters
-
Have monthly / quarterly water samples been taken and results acted upon
-
If results are unsatisfactory, has action been taken to resolve this
-
If results have been unsatisfactory have trends been examined for underlying problems
-
Are cooling towers in good visible condition
-
Are water features in good visible condition
-
Is the management responsibilities information up to date
-
Are all training records on file and up to date
-
Has the annual management review been completed
Topic focus - COSHH
-
Are there adequate storage arrangements for all chemicals
-
Are spill kits provided at suitable locations and all full / in date
-
Is appropriate PPE available
-
Are safety data sheets readily accessible for all chemicals present
-
Is there sufficient evidence that COSHH assessments are being followed
-
Are training records available for all relevant staff
Topic focus - Asbestos
-
Has the potential or presence of asbestos been confirmed (minimum management survey of common areas in property built pre 2000)
-
Are responsibilities for managing ACMs defined (BPSEM and tenant)
-
Is an asbestos register available and communicated to contractors
-
Is an annual re-inspection carried out (If required)
-
Are any ACMs currently showing signs of damage / lack or repair
-
Quarter 4: Oct - Dec
Contractor Audit - Cleaning
-
Main contractor reviewed
-
Participants (contractor)
-
Are risk assessments for all activities in place
-
Have emergency procedures been communicated to all cleaning staff
-
Are storage areas tidy and secure
-
Are chemical storage arrangements acceptable and data sheets available on site
-
Is there adequate control of cleaning chemicals on site
-
Is there evidence of control of slip / trip risks
-
Are standards of cleaning generally acceptable
-
Are catering facilities adequately cleaned ( inc. extract ducts and deep cleans)
Contractor audit - Window cleaning
-
Main contractor reviewed
-
Participants (contractor)
-
Are suitable risk assessments and method statements available on site
-
Is there sufficient evidence that risk assessments and method statements are being followed
-
Are emergency rescue plans available on site for all work at height
-
Are training records up to date for use of work equipment (cradles etc.)
-
Is the general standard of cleaning acceptable
Topic focus - Work at height
-
Is there an adequate maintenance and inspection regime for all work at height equipment and accessories (cradles, fall arrest, eye bolts etc)
-
Does all equipment have a current valid thorough examination certificate
-
Are training records for operatives available, and up to date
-
Are suitable risk assessments and method statements available for all associated works
-
Is there a suitable maintenance and inspection regime for all site ladders ( fixed and portable)
-
Are storage arrangements for ladders adequate Inc. security to prevent unauthorised use
Topic focus - Waste
-
Are carriers licences available and up to date
-
Are all waste transfer notes retained and available
-
Is there adequate segregation of hazardous waste
-
Is there an adequate maintenance and inspection regime for compactors / nailers
-
Are operating instructions for any compactors / bailers clearly displayed
-
Are there adequate arrangements to prevent misuse of compactors / bailers
-
Is waste adequately stored and controlled to prevent fire risks or vermin
Section 5 - Fire door checks
-
Guidance about fire door checks
-
Tick to add door inspection
-
Door location
-
Door in good condition with no visible holes / damage?
-
Frame in good condition with no visible holes / damage?
-
Intumescent and smoke seals in good condition?
-
Door closes completely and unaided?
-
Gaps between door and frame ( or between double doors) is acceptable?
-
Add a photograph of door assessed (photographs of damage / faults should be added against the relevant question)
Additional door
-
Door location
-
Door in good condition with no visible holes / damage?
-
Frame in good condition with no visible holes / damage?
-
Intumescent and smoke seals in good condition?
-
Door closes completely and unaided?
-
Gaps between door and frame ( or between double doors) is acceptable?
-
Add media
Section 6 - Meter readings
Electricity meter readings
-
-
Meter number
-
Location / Tenant
-
Meter reading
-
Add photo of meter
Additional meter
-
Meter number
-
Location / Tenant
-
Meter reading
-
Add photo of meter
Gas meter readings
-
-
Meter number
-
Location / Tenant
-
Meter reading
-
Add photo of meter
Additional meter
-
Meter number
-
Location / Tenant
-
Meter reading
-
Add photo of meter
Water meter readings
-
-
Meter number
-
Location / Tenant
-
Meter reading
-
Add photo of meter
Additional meter
-
Meter number
-
Location / Tenant
-
Meter reading
-
Add photo of meter
Section 7 - Contractor observations
Observation of contractor activity
-
Tick to add observation
-
Contractor
-
Location
-
Works observed
-
Comment
-
Risk assessment and method statement available
-
Adherence to Permit to work
-
Work method and risk control
Another observation record
-
Contractor
-
Location
-
Works observed
-
Comment
-
Risk assessment and method statement available
-
Adherence to Permit to work
-
Work method and risk control
Section 8 - Additional findings
Additional findings / hazards
-
Add additional findings / actions
-
Area / location
-
Description of hazard
-
Action required and priority
Comments
-
General comments
-
Onsite staff comments