Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site 1
Site 1
-
Select date
-
Rack Inspection Checklist
Rack Inspection
-
Rack
- Rack A
- Rack B
- Rack C
- Rack D
- Rack E
- Rack F
- Rack G
-
Bay
- Bay 1
- Bay 2
- Bay 3
- Bay 4
- Bay 5
- Bay 6
- Bay 7
-
Observation
- Damaged
- Dislodged
- Missing Items
- Non-Compliance
- Other
- Compliant
-
Non Compliant Item
-
Add media
-
Materials and remarks
-
Rating
-
location
- lower
- top
- front
- back
- bottom
- upper
-
Item
- FRT Beam
- BL
- Signage
- brace
- column guard
- nut
- bolt
- beam
-
Photo
-
Recommended actions
- Replace
- Reinstall
- Install
- Remove
- Dismantle
- Monitor only
- Other
-
Provide Recommendation
-
Materials/Remarks
-
Rating
-
Provide additional comments on Materials and remarks
-
Rating
-
Item/s that require attention
- with new bean
- new beam pins
- compliant signage
- new upright
- beam
- new guard
- IAW Correct Procedures
- bracing nut and bolt
-
Materials/Remarks
-
Provide additional comments on Materials and remarks
-
Rating
-
Rating
-
Provide Recommendation
-
Materials/Remarks
-
Provide additional comments on Materials and remarks
-
Rating
-
Rating
-
Materials/Remarks
-
Provide additional comments on Materials and remarks
-
Rating
-
Rating
-
Observation Notes
-
Add image
-
Recommended actions
- Replace
- Reinstall
- Install
- Remove
- Dismantle
- Monitor only
- Other
-
Provide Recommendation
-
Materials/Remarks
-
Rating
-
Item
- with new bean
- new beam pins
- compliant signage
- new upright
- beam
- new guard
- IAW Correct Procedures
- bracing nut and bolt
-
Materials/Remarks
-
Rating
-
Provide additional comments on Materials and remarks
-
Rating
-
Provide Recommendation
-
Materials/Remarks
-
Provide additional comments on Materials and remarks
-
Rating
-
Rating
-
Rating
-
Add media
-
Inspection complete. No further action required
-
Add signature