Information
-
Client / Site
-
Project name
-
Project No.
-
Site Supervisor/Leading hand:
-
Time and Date:
-
Number of people working in your group (including subcontractors):
-
List any expected visitors to site:
-
Location
-
Select today's weather conditions:
- Sunny or cloudy & mild-warm temperature
- Rain/showers & cold temperature
- Heavy rain/hail
- Thunderstorms/lightning
- Strong winds
- Icy surfaces
- Extreme heat
- Extreme cold
- Extreme weather warning
-
For extreme weather conditions, provide details of any precautionary measures or warnings:
-
Have all Issues/incidents from the previous day been cleared?
-
Do you have sufficient PPE on site? If NO list them
-
Have all Environmental Issues been cleared? If NO list them eg. Air quality, noise, waste disposal etc
-
Plant and Equipment checked and safe to use? If NO work cannot be carried out until appropriate action taken.
-
Has work area where EWP/Scissor lift will be used, been assessed and barricaded off if appropriate?
-
All hazardous substances being used, have current MSDS/SDS (within 5 years) available?.
-
Qualifications/training of all workers adequate for work activities? If NO work cannot be carried out unless trained to do so.
-
Have all new workers completed the site induction?
-
Principal Contractor/Client/Builder's pre start assessment communicated to all workers?
-
Work area inspected and deemed safe for workers to enter and work in today?
SWMS sign on and review completed on individual SWMS - refer to these documents for each project.
-
Project related tasks, click "Add Activity" to add details:
Activity
-
Select tasks required:
- Cable installation (CABN)
- Cable tray installation (CABT)
- Bracket installation (BRKT)
- Equipment Rack fit off (RKON)
- Field Equipment Installation (FLD)
- Commissioning (COMM)
- Equipment Rack workshop (RKOF)
- Other task?
-
List:
-
Select relevant SWMS for tasks above:
- # 01Working at Heights
- #02 Scaffold-Erecting
- #03 Elevated Work Platform (EWP)/scissor lift
- #04 Ladders safe use
- #05 Construction plant machinery -working around
- #06 Electrical fit off
- #07 Electrical wiring-low voltage
- #08 Electricity-working around
- #09 Confined spaces
- #10 Audio Visual Equipment Installation
- #11 Manual Handling-hazardous manual tasks
- #12 Noise control
- #13 Chemical hazardous
- #14 Lock Out Tag Out (LOTO)
- #15 Hot Works
- #16 Walkie Stacker manual operation
- #17 Warehousing general
- #18 Power Tools General operation
- #19 Gas Actuated Tool
- #20 Power tools-explosive
- #21 Soldering operation
- #22 Working with Synthetic mineral fibres (SMF)
- #23 Working in Heat/heat stress
- #24 Testing and tagging electrical cords
- #25 Core drill operation
- #26 Office Safety
- #29 Grinder Handheld operation
- #32 Metal saw cut off operation
- Other JSA or SWMS?
-
List:
-
Do all Project tasks have a relevant JSA and/or SWMS available? If NO develop one
-
If a permit is required for any above task, has it been completed and communicated?<br>If No, work cannot commence until this is done, please provide detail below:
-
All subcontractors inducted and signed on to SWMS? If no, work cannot be carried out until completed.
Work in progress
-
Comments on any project issues. e.g: Project variations, delays, interface issues, materials on order/received, plant and equipment hire.
Site attendance - Subcontractor(s) and staff sign on below. Rutledge AV site personnel can also sign on in Pronto kiosk.
-
Sign on, click "Add Worker" to add person:
Subcontractor or Staff Member
-
Name:
-
Company representing:
-
Signature
-
Start time
-
Finish time
-
Total hours:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
Site Supervisor sign off:
-
Supervisors/Leading Hand signature:
-
Supervisors/Leading Hand name:
-