Information
-
Date
-
Site
-
Conducted on
-
Prepared by
-
INSPECTION PROCEDURE:
Observe liquid in secondary containment for Oil, Oil Sheen, or Evidence of contact with any Contaminants. NOTE: If any Contaminants are Present, Dispose of properly and do not discharge in to environment.
Main Electric Transformer(T1)
-
Contaminants Present?
-
Picture of containment.
-
Start time of Of Dranage.
-
End time of Drainage.
-
Individual Conducting Inspection Signature.
Grounding Transformer(GT1)
-
Contaminants Present?
-
Picture of containment.
-
Start time of Of Dranage.
-
End time of Drainage.
-
Individual Conducting Inspection Signature.
Grounding Transformer(GT2)
-
Contaminants Present?
-
Picture of containment.
-
Start time of Of Dranage.
-
End time of Drainage.
-
Individual Conducting Inspection Signature.