Title Page
-
Conducted on
-
Prepared by
-
Location
-
Client Name / Company Name
-
Contact Person
-
Client Email Address
-
Contact Number for person on site
-
Type Site
-
Type of System
- Grid Tie
- Hybrid (PV & backup only)
- Hybrid (Grid Support)
- Off-Gird
- Backup Only
-
Type of Battery
-
Number of Panels
Site Details
-
Single or Three Phase?
-
Location of DB Board
-
Photo of DB Board (Cover on)
-
Photo of DB Board (Cover Off)
-
Proposed Location of Inverter & Batteries
-
Description of Proposed Location of Inverter & Batteries
-
Roof Pitch
-
Type of Roof
- Corrugated
- IBR
- Clay/Cement Tile
- Concrete
- Harvey Tile
- Thatch
- Cliplock
-
Type of Roof (Photo)
-
Proposed Frame Type
-
Building Type
- Single Storey (Easy Roof Access)
- Single Storey (Difficult Roof Access)
- Double Storey (Easy Roof Access)
- Double Storey (Difficult Roof Access)
- Commercial Roof (Ladder Access)
- Commercial Roof (Lifting Equipment Required)
-
Roof Access
-
Proposed Location of Panels
-
Roof Condition
System Details
-
System Discussed with client
-
If Other, supply details
-
Current Electric Bill
-
Current Daily Average Consumption (kWh)
-
Current Peak (kW)
Notes
-
Any details that might influence pricing
-
Extra site photos
Inspectors Details
-
Was location for inverter install explained to the customer
-
Is the client aware that some surface cabling may be required?
-
Was lead times for lithium batteries discussed with client?
-
This site inspection document will be used for final quoting purposes, any shortfalls on cable lengths etc will be for the inspectors account. Please ensure all answers are given as accurate as possible. Do you as inspector accept the above and agree to Red Energy International's terms and conditions of sale?
-
Re-seller / Installer Company Name
-
Responsible Person
-
Inspectors Signature
Client Section
-
Are you satisfied with how the various systems were explained?
-
Are you happy with the proposed location of the Inverter & Batteries
-
Are you happy with the proposed location of the Solar Panels
-
Has it been explained to you that changing the proposed installation location of the Inverter, Batteries or Panels may influence final cost of the system?
-
Full Name & Surname
-
Signed at
-
Date
-
Client Signature