Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
Section 1.
Documentation, Signs & Posters Displayed. 1st Aid Arrangements.
-
1. All statutory notices completed and displayed?
-
2. Latest CPUK Ltd Policies displayed?
-
3. Are the required CPUK Ltd notices fully completed and displayed on the H&S Notice Board?
-
4. Are competent persons appointments clearly displayed and in writing?
-
5. Are there sufficient First Aiders on site and adequate first aid equipment available?
-
6. Accident book & documentation up to date? Are records being sent in to 'S. H.E. Manager & not kept on site?
-
7. Has the Construction Phase Plan (C.P.P.) (S001) been updated in the last month? Updates pages completed including the comments from 4 weekly plans.
-
8. 4 Weekly Plan in place - displayed in the office/canteen/reception?
Health & Safety Statutory Registers / Regular inspections.
-
9. Scaffold inspections, including scaffold towers up to date and fully completed, inclusive of a pictoral record?
-
10. Plant & Equipment inspections up to date and fully completed?
-
11. Excavation inspections up to date and fully completed?
-
12. Actions completed from last S50 S003 Audits/S.V.R.s action sheet/close out reports?
-
13. Is the S.H.E. filing system in good order and being maintained so that documentation can be easily be retrieved when and where necessary?
Section 2.
Sub- Contractors / Visitors
-
14. Is the visitors book being used correctly?
-
15. Site specific induction, including site rules, BREAAM requirements (if applicable), carried out and recorded to all site personnel?
-
16. Contractors RAMs suitably evaluated and briefing forms completed prior to work commencing? Are addendums being completed and operatives re - briefed accordingly?
-
17. Are COSHH Assessments completed and acknowledged by operatives - register available?
-
18. Are toolbox talks being undertaken and recorded?
Traffic and Pedestrian Management /Site Vehicles.
-
19. Specific Traffic Management Plan is available (inc. Drawing ) - and communicated to all on site?
-
19a. Pedestrian Segregation provided to a safe place clearly demarced and clear signage in place. "Wave Hello /Goodbye" system in place if adopted.
-
19b. Safe Zoning and Phasing in place as required.
-
20. Competent vehicle banksman designated for the site - including red hi-viz vest?
-
21. New roads & streetworks act : have works been sufficiently planned by a competent supervisor with the relevant documentation in place : Section 278 agreement, S50 license in place, section 104 license.
Section 3
Lifting Operations (LOLER Regulations ).
-
22. Lifting plans in place? Competent person planning the lift in accordance to B.S. 7121 /LOLER? Have lift plans been approved by D. Mc Cord or his deputy prior to commencement? Is the permit to operate crane in place?
-
22a. Repetitive Lifting Plan in place for unusual Lifting Operations ( CPA Guidance adhered to ) SSW in place.
-
23. Weekly LOLER inspections completed on any other lifting equipment such as Genies, Hoists, Mini Floor Cranes, Electric Pop Ups etc?
-
24. All lifting chains / slings / shackles have an up to date thorough examination certificate?
-
25. CPCS or equivalent certified banksman / slinger is available for the crane operations?
Excavations.
-
26. Pre Construction Services dwgs available, CAT Scan available with competent person to operate, Coordinated Site Services drawing up to date and available.
-
26 (a). Permit to dig in place before works commence, fully completed with accurate drawings and has been accepted by sub contract supervisor? Permit available on site?
-
27. Safe System of Work in place and adhered to?
Section 4
Plant / Machinery.
-
28. Fixed plant has necessary documentation / Safe System of Work / competent operator(s)?
-
29. Abrasive Wheels certification for changing wheels in place?
Confined Spaces.
-
30. Permit to Enter in place? Top Man record fully completed?
-
31. Adequate Safe System of Work defined in RAMS and being adhered to on site
Fire Risk Management & Controls
-
32. Fire Risk Assessment - Is there a Fire Risk Assessment in place (RA66 /External Consultant)?
-
33. Are daily/weekly Fire Checks being completed on the S50? 1. Fire escapes routes & exits. 2. Fire safety signage. 3. F.F.E. / Fire Alarms/Fire Points/Fire Action Notices. 4. Emergency Lighting Provisions. 5. Storage of H.F.L. & Gas Cylinders. 6. Are temporary protection coverings compliant with LPS 1207?. 7. Waste removal procedures (housekeeping). 8. No Smoking Policy adhered to.
-
34. Hot Works - Are RAMS in place, SSW adhered to, Hot Works Permits issued & adhered to?
Housekeeping / Welfare Facilities.
-
35. Adequate Welfare facilities - canteen, toilets, drying room, hot & cold water, cooking facilities - all in good order and kept clean & tidy?
-
36. Housekeeping is of a good standard - no slips/trips hazards - clean and tidy.
-
37. Materials Storage - site plan available showing designated areas / access and egress.
Temporary Works
-
38. Temporary Works procedures/Register in place and up to date (in accordance with CPUK Management of T.W. S052?
-
39. Temporary Works Permits in place and up to date?
-
39a. Temporary Works designs in place and installed in accordance with the designs. SSW in place.?
Section 5.
Work At Height.
-
40. Roof work / work at height is controlled - access/egress, scaff tag system in place, demarcation, fall prevention and fall arrest systems,? (Demarcation to be at least 2 Metres from any leading edge and include appropriate warning signage)?
-
41. Edge protection ALWAYS consists of double guard /handrails and toe boards?
-
42. Scaffolding erected by competent persons in accordance with SG4:15 & TG20:13?
-
43. Temporary works design and 3rd party sign off for scaffolds and loading towers?
-
44. Work off ladders / stepladders if used - Permit in place?
-
45. Mobile Towers - including training to PASMA (or equivalent ) ? Tags on towers or stripped if not in use?
-
46. Stairways suitably protected? Handrails at the correct height from the nosing?
-
47. Loading Towers have suitable gates (up & over gates) so that operatives do not need to approach an edge?
-
48. Lift Shaft protection - handrails /toeboards & signage in place?
-
49. Floor openings are protected by a fixed barrier or with a suitable and secured cover - with signage posted?
-
50. Propriety Decking Systems/ Safety Nets / airbags Hand over certificates issued and inspected every 7 days by a competent person?
Section 6.
Electricity/Electrical Equipment.
-
51. Permit to Work in operation?
-
52. Underground / Overhead cables identified?, site transformers installed correctly? Safe System of Work in place?
-
53. Initial Temporary Electrical Installation test certificate in date and displayed? Periodic (3 month / 12 month) Temporary Electrics Certificate up to date and displayed?
-
54. Weekly Site Welfare RCD trip checks completed?
-
55. Temporary Lighting in place and adequate?
-
56. Are lux levels recorded on S21 monthly or as lighting conditions change?
-
57. Are CPUK PAT tests undertaken as necessary? Sub-Contractor tools included in RAMs?
Occupational Health.
-
58. HAVs trigger times available - suitable monitoring in place?
-
59. Asbestos Management plan in place - surveys - HSE notifications in place?
-
60. Manual handling issues identified / controlled - handling assessments in place?
-
61. Noise - dB ( a ) values for relevant plant - controlled zones round noisy plant / machinery?
-
62. Occupational asthma - dust suppression, water damping / extraction etc in place?
-
63. Lead At Work - is exposure to lead and lead based products being controlled? Safe System of Work in place and being adhered to? Surveys completed?
Demolition Works
-
64. Are suitable RAMS in place for ALL Demolition Works prior to works commencing? Are certified operatives being used? Are the works being supervised by a competent person?
-
65. Is there a S.S.W. in place and is it being adhered to? Is all plant and equipment fitted with the appropriate guards/guarding?
Section 7.
Environmental Management.
-
66. Are the required CPUK notices all fully completed and displayed on the Environmental Notice Board?
-
67. Good neighbour practices; Noise, Vibration, Dust and Dirt and Air
-
68. Energy / Fuel consumption measures; Housekeeping arrangements in place?
-
69. Protection of wildlife; newts, bats, badgers, nesting birds, hedgerows in place?
-
70. Pollution - spill controls /kits available; Fuel and oil storage and re-use measures in place? Washing down of plant & machinery undertaken in designated areas?
-
71. Waste transfer licenses, transfer notes in place?
-
72. Waste - segregation of waste /waste storage and re-use measures in place?
-
73. Suitable, specific and secure storage available for COSHH items/substances, including adequate signage?
General Safety, Health & Environmental Comments (Micellaneous ).
-
74. Public protection, perimiter fencing, signs and security is adequate? Perimiter boundary fencing secured with double clips?
-
75. Is P.P.E. being worn as required and are adequate spares availavble?
-
76. Has there been a need to serve an Internal CPUK Prohibition Notice?
-
77. Has there been a need to serve an Internal CPUK Improvement Notice?
-
78. Has there been a need for S.H.E. Manager Intervention (S.M.I.)?
-
79. A.O.B.