Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

Section 1.

Documentation, Signs & Posters Displayed. 1st Aid Arrangements.

  • 1. All statutory notices completed and displayed?

  • 2. Latest CPUK Ltd Policies displayed?

  • 3. Are the required CPUK Ltd notices fully completed and displayed on the H&S Notice Board?

  • 4. Are competent persons appointments clearly displayed and in writing?

  • 5. Are there sufficient First Aiders on site and adequate first aid equipment available?

  • 6. Accident book & documentation up to date? Are records being sent in to 'S. H.E. Manager & not kept on site?

  • 7. Has the Construction Phase Plan (C.P.P.) (S001) been updated in the last month? Updates pages completed including the comments from 4 weekly plans.

  • 8. 4 Weekly Plan in place - displayed in the office/canteen/reception?

Health & Safety Statutory Registers / Regular inspections.

  • 9. Scaffold inspections, including scaffold towers up to date and fully completed, inclusive of a pictoral record?

  • 10. Plant & Equipment inspections up to date and fully completed?

  • 11. Excavation inspections up to date and fully completed?

  • 12. Actions completed from last S50 S003 Audits/S.V.R.s action sheet/close out reports?

  • 13. Is the S.H.E. filing system in good order and being maintained so that documentation can be easily be retrieved when and where necessary?

Section 2.

Sub- Contractors / Visitors

  • 14. Is the visitors book being used correctly?

  • 15. Site specific induction, including site rules, BREAAM requirements (if applicable), carried out and recorded to all site personnel?

  • 16. Contractors RAMs suitably evaluated and briefing forms completed prior to work commencing? Are addendums being completed and operatives re - briefed accordingly?

  • 17. Are COSHH Assessments completed and acknowledged by operatives - register available?

  • 18. Are toolbox talks being undertaken and recorded?

Traffic and Pedestrian Management /Site Vehicles.

  • 19. Specific Traffic Management Plan is available (inc. Drawing ) - and communicated to all on site?

  • 19a. Pedestrian Segregation provided to a safe place clearly demarced and clear signage in place. "Wave Hello /Goodbye" system in place if adopted.

  • 19b. Safe Zoning and Phasing in place as required.

  • 20. Competent vehicle banksman designated for the site - including red hi-viz vest?

  • 21. New roads & streetworks act : have works been sufficiently planned by a competent supervisor with the relevant documentation in place : Section 278 agreement, S50 license in place, section 104 license.

Section 3

Lifting Operations (LOLER Regulations ).

  • 22. Lifting plans in place? Competent person planning the lift in accordance to B.S. 7121 /LOLER? Have lift plans been approved by D. Mc Cord or his deputy prior to commencement? Is the permit to operate crane in place?

  • 22a. Repetitive Lifting Plan in place for unusual Lifting Operations ( CPA Guidance adhered to ) SSW in place.

  • 23. Weekly LOLER inspections completed on any other lifting equipment such as Genies, Hoists, Mini Floor Cranes, Electric Pop Ups etc?

  • 24. All lifting chains / slings / shackles have an up to date thorough examination certificate?

  • 25. CPCS or equivalent certified banksman / slinger is available for the crane operations?

Excavations.

  • 26. Pre Construction Services dwgs available, CAT Scan available with competent person to operate, Coordinated Site Services drawing up to date and available.

  • 26 (a). Permit to dig in place before works commence, fully completed with accurate drawings and has been accepted by sub contract supervisor? Permit available on site?

  • 27. Safe System of Work in place and adhered to?

Section 4

Plant / Machinery.

  • 28. Fixed plant has necessary documentation / Safe System of Work / competent operator(s)?

  • 29. Abrasive Wheels certification for changing wheels in place?

Confined Spaces.

  • 30. Permit to Enter in place? Top Man record fully completed?

  • 31. Adequate Safe System of Work defined in RAMS and being adhered to on site

Fire Risk Management & Controls

  • 32. Fire Risk Assessment - Is there a Fire Risk Assessment in place (RA66 /External Consultant)?

  • 33. Are daily/weekly Fire Checks being completed on the S50? 1. Fire escapes routes & exits. 2. Fire safety signage. 3. F.F.E. / Fire Alarms/Fire Points/Fire Action Notices. 4. Emergency Lighting Provisions. 5. Storage of H.F.L. & Gas Cylinders. 6. Are temporary protection coverings compliant with LPS 1207?. 7. Waste removal procedures (housekeeping). 8. No Smoking Policy adhered to.

  • 34. Hot Works - Are RAMS in place, SSW adhered to, Hot Works Permits issued & adhered to?

Housekeeping / Welfare Facilities.

  • 35. Adequate Welfare facilities - canteen, toilets, drying room, hot & cold water, cooking facilities - all in good order and kept clean & tidy?

  • 36. Housekeeping is of a good standard - no slips/trips hazards - clean and tidy.

  • 37. Materials Storage - site plan available showing designated areas / access and egress.

Temporary Works

  • 38. Temporary Works procedures/Register in place and up to date (in accordance with CPUK Management of T.W. S052?

  • 39. Temporary Works Permits in place and up to date?

  • 39a. Temporary Works designs in place and installed in accordance with the designs. SSW in place.?

Section 5.

Work At Height.

  • 40. Roof work / work at height is controlled - access/egress, scaff tag system in place, demarcation, fall prevention and fall arrest systems,? (Demarcation to be at least 2 Metres from any leading edge and include appropriate warning signage)?

  • 41. Edge protection ALWAYS consists of double guard /handrails and toe boards?

  • 42. Scaffolding erected by competent persons in accordance with SG4:15 & TG20:13?

  • 43. Temporary works design and 3rd party sign off for scaffolds and loading towers?

  • 44. Work off ladders / stepladders if used - Permit in place?

  • 45. Mobile Towers - including training to PASMA (or equivalent ) ? Tags on towers or stripped if not in use?

  • 46. Stairways suitably protected? Handrails at the correct height from the nosing?

  • 47. Loading Towers have suitable gates (up & over gates) so that operatives do not need to approach an edge?

  • 48. Lift Shaft protection - handrails /toeboards & signage in place?

  • 49. Floor openings are protected by a fixed barrier or with a suitable and secured cover - with signage posted?

  • 50. Propriety Decking Systems/ Safety Nets / airbags Hand over certificates issued and inspected every 7 days by a competent person?

Section 6.

Electricity/Electrical Equipment.

  • 51. Permit to Work in operation?

  • 52. Underground / Overhead cables identified?, site transformers installed correctly? Safe System of Work in place?

  • 53. Initial Temporary Electrical Installation test certificate in date and displayed? Periodic (3 month / 12 month) Temporary Electrics Certificate up to date and displayed?

  • 54. Weekly Site Welfare RCD trip checks completed?

  • 55. Temporary Lighting in place and adequate?

  • 56. Are lux levels recorded on S21 monthly or as lighting conditions change?

  • 57. Are CPUK PAT tests undertaken as necessary? Sub-Contractor tools included in RAMs?

Occupational Health.

  • 58. HAVs trigger times available - suitable monitoring in place?

  • 59. Asbestos Management plan in place - surveys - HSE notifications in place?

  • 60. Manual handling issues identified / controlled - handling assessments in place?

  • 61. Noise - dB ( a ) values for relevant plant - controlled zones round noisy plant / machinery?

  • 62. Occupational asthma - dust suppression, water damping / extraction etc in place?

  • 63. Lead At Work - is exposure to lead and lead based products being controlled? Safe System of Work in place and being adhered to? Surveys completed?

Demolition Works

  • 64. Are suitable RAMS in place for ALL Demolition Works prior to works commencing? Are certified operatives being used? Are the works being supervised by a competent person?

  • 65. Is there a S.S.W. in place and is it being adhered to? Is all plant and equipment fitted with the appropriate guards/guarding?

Section 7.

Environmental Management.

  • 66. Are the required CPUK notices all fully completed and displayed on the Environmental Notice Board?

  • 67. Good neighbour practices; Noise, Vibration, Dust and Dirt and Air

  • 68. Energy / Fuel consumption measures; Housekeeping arrangements in place?

  • 69. Protection of wildlife; newts, bats, badgers, nesting birds, hedgerows in place?

  • 70. Pollution - spill controls /kits available; Fuel and oil storage and re-use measures in place? Washing down of plant & machinery undertaken in designated areas?

  • 71. Waste transfer licenses, transfer notes in place?

  • 72. Waste - segregation of waste /waste storage and re-use measures in place?

  • 73. Suitable, specific and secure storage available for COSHH items/substances, including adequate signage?

General Safety, Health & Environmental Comments (Micellaneous ).

  • 74. Public protection, perimiter fencing, signs and security is adequate? Perimiter boundary fencing secured with double clips?

  • 75. Is P.P.E. being worn as required and are adequate spares availavble?

  • 76. Has there been a need to serve an Internal CPUK Prohibition Notice?

  • 77. Has there been a need to serve an Internal CPUK Improvement Notice?

  • 78. Has there been a need for S.H.E. Manager Intervention (S.M.I.)?

  • 79. A.O.B.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.