Title Page
-
Refurbishment
-
Conducted on
-
Location
-
Personnel
General
-
Overall budget
-
Facilities budget
-
Equipment budget
-
Projected start date
-
Projected end date
-
Gymetrix study received back
-
Existing drawing complete
-
Ideas for site
Facilities
-
Carpets to be replaced throughout
-
Male changing room full refurb
-
Female changing room full refurb
-
Gym floor lighting to be completed
-
DDA shower full refurb
-
DDA toilet full refurb
-
Free weights flooring
-
Functional flooring
-
Ideas for site
-
Pictures
Reception
-
New kiosks required
-
Extra pod/pods required?
-
Barrier matting to be extended
-
Ideas
-
Pictures
Office/comms
-
New IT required
-
Ideas
-
Pictures
Staff room
-
New lockers required
-
Ideas
-
Pictures
CV
-
Does the gym have climbmills?
-
Any other cardio requirements?
-
GM informed on how to check equipment usage
-
Pictures of current layout
-
New Layout ideas
Cycle Studio
-
Bikes need replacing
-
Pictures of spin studio
Main Studio
-
Step boxes need replacing?
-
Pump rack and bars to be replaced
-
Mats need replacing?
-
List of all items to be ordered
-
Pictures of studio
Resistance machines
-
Prone leg curl required?
-
Cable machines in good working order?
-
Items to recondition
-
Any other requirements?
-
List of all items to be ordered
-
Pictures of cables
Freeweights
-
New DBs needed?
-
New plates needed?
-
New squat racks needed?
-
Other comments and ideas
-
List of all items to be ordered
-
Pictures
Functional area
-
Other comments
-
Rig to be added? If so size and photo of space
-
All 3rd party as per standard quote to be replaced?
-
List of all items to be ordered
-
Pictures
Stores
-
Pictures
-
Other comments
Final Notes
-
Pictures
-
Other comments