Title Page

  • Conducted on

  • Prepared by

Club Name & Details

  • Club Name

  • Budget

  • Capex To Date

External including Signage

  • Location images

Entrance and Pods

  • Outline Plan

  • Does barrier matting need to be swapped?

  • Barrier matting amount of tiles out from pods

  • New kiosk location

  • Area images

  • Have front doors been adjusted to allow button free exit at night

Main gym floor

  • Outline Plan

  • Do carpets need to be swapped?

  • Full redecorate required?

  • Area images

Yanga & Hydro Massage

  • Location images

Vending Area

  • Outline Plan

  • Flooring To Be Expona?

  • New bulkhead required?

  • Area images

Functional Area

  • Outline Plan

  • Build up discussed and contractor informed by Functional provider

  • Location of track, rig and storage confirmed

  • Area Images

  • Location of clock

  • Location of TVs

  • Add location
  • Location of Music Panel

Studio

  • Outline Plan

  • Images

  • Location of Music System if Changing

  • Double height wall for expona confirmed

  • Add media

  • Mirror configuration confirmed

  • Add media

Cycle

  • Outline Plan

  • Images

  • Location of Music System if Changing

  • Mirror configuration confirmed

  • Add media

Flex Areas

  • Outline Plan

  • Images

  • Mirror configuration confirmed

  • Add media

Free Weights

  • Outline Plan

  • Images

  • Mirror configuration confirmed and dimensions on drawing

  • Add media

  • Flooring issues have been assessed

  • Free weights closure discussed

Cardio

  • Outline Plan

  • Images

  • Electrical configuration confirmed and dimensions on drawing

  • Add media

Fixed Pin

  • Outline Plan

  • Images

Male Changing Room

  • Outline Plan

  • Images

  • Location of Changing Cubicles

  • Additional vanity units required

  • Add media

Female Changing Room

  • Outline Plan

  • Images

  • Location of Changing Cubicles

  • Additional vanity units required

  • Add media

DDA Shower and Toilet

  • Outline Plan

  • Images

Cleaning Cupboard

  • Outline Plan

  • Images

Staff room

  • Outline Plan

  • Images

Office

  • Outline Plan

  • Podium/ gym floor desk hub etc

  • Images

PT assessment

  • Outline Plan

  • Images

Extraction and Install Plan

  • Plan for extraction discussed

  • Instructions for mileage check sent over

  • Equipment Plan Sent Over

3rd Party Items

  • Bins Required?

  • Vending Furniture Required?

  • Office Furniture Required?

  • Boom Box Required?

  • Images

Equipment

  • Add media

Internal Signage

  • Location images

AOB

    Item
  • Finishes plan ideas

  • Images

Phasing

  • Phasing Drawing

Sign Off

  • GM/AGM/RM Sign Off - Happy That All Relevant Information Has Been Communicated

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.