Information
-
Document No.
-
Property
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Reinstatement
-
Location ie Main Track to tower site 12.
-
Before reinstatement photograph.
Material.
-
Imported material uplifted and removed from property and area re- contoured.
-
Imported material uplifted and stockpiled for use of LO at agreed dump site, and re-contoured.
-
Imported material uplifted and utilised as fill to re-contour.
-
Surface ripped to ensure drainage and re-contoured.
-
Tracks left with top soil bunds sediment controls removed
-
Dump Site:
Reinstated Area
-
Grass seed sown by LO or TP
-
Area to be fence off by LO or TP
-
Seed Type:
-
Additional Comments:
-
After Reinstatement Photograph.
-
All attendees understand the above information and acknowledge site works can commence in line with the above scope.
-
Reinstatement Sign off.
Staff
-
Add signature