Information
-
CONTRACT
-
AUDITOR
-
GANG ID
-
GANG LEADER
-
DIRECT OR SUBCONTRACTORS
-
Audit date
-
Location
SLG / SAFETY / CERTIFICATION
-
SLG & site layout as per Codes Of Practice
-
Do gang have correct accreditation ?NRSWA Unit7 Hot bituminous materials
-
Stop gang from working and contact your project manager
-
Permit board displayed / completed / appropriate
-
POWRA COMPLETED ?
-
Do gang have fire extinguisher ?
-
Do gang have first aid kit and in date ?
-
Do gang have spill kit .?
-
Is water bottle being used / available ?
-
Vehicle, plant, tools & materials fit for purpose / stored safely
-
Provide hotbox number plate
-
Correct compaction equipment for surface type? Read notes....
-
Compaction requirements....NARROW TRENCH ; backfill with modified upright vibrotamper (2 passes) backfill again (3passes). Base /first layer 55kg modified upright vibrotamper (4passes) Wearing course with surcharge use roller (10 passes) or driveway plate. FEEDER TRENCH ; 55kg upright vibrotamper (4passes) .Base (5 passes) , wearing course with surcharge use roller (10 passes) or driveway plate.
-
Site condition / Environmental considerations acceptable
-
PPE Appropriate & in use
REINSTATEMENT METHODS / MATERIALS
-
Road type / construction known & applied
-
Backfill materials suitable
-
Compaction of backfill correct / appropriate
-
Watering can fitted with a rose ?
-
Bituminous materials within correct temperature range / suitable
-
Edge sealant used / appropriate
-
Compaction of bituminous correct / appropriate
QUALITY & PERFORMANCE
-
Cut back / proximity to SROH
-
Profile / trips / edge depression within tolerance to SROH
-
Damaged modules / slabs replaced
-
Road markings replaced permanent or temporary with appropriate material
MEASUREMENT AUDIT
-
type1 materials /backfill appropriate and correct levels (photo with depth gauge )
-
Surface and wearing course to correct thickness (photo with depth gauge)
SUMMARY
-
Please provide any other info not covered and feedback from yourself or gang
SIGNATURES
-
Auditor(s) signature
-
Discuss your findings with the team. Encourage them to give you feedback. Help identify where we can all improve safety, quality and welfare. Encourage reporting and explain why it is so important to Callan Connects future. If you agree to raise an issue on their behalf make sure you keep your promise.