Information
-
GADB Ref:
-
Notice Ref:
-
Team Leader:
-
Location:
-
RTA Conducting Audit:
-
Date:
-
Is site clear of all SLG and/or spoil (Pictures required).
-
Comments:
-
Pictures of site in all instances:
-
Road Type and Location:
- CW Type 0
- CW Type 1
- CW Type 2
- CW Type 3
- CW Type 4
- Footway
- Verge
-
Materials and Dimensions:
-
Picture of Completed Reinstatement
-
Does the surface materials match existing?:
-
What material has been used?
-
Picture of wrong material:
-
Are all surface materials free from contamination?:
-
Comment:
-
Add media
-
Is there evidence that edge sealant has been used?
-
Where was evidence obtained from i.e. IMS?
-
Are any Edge Cracks / Adjacent Edge Cracks visible?
-
Comments:
-
Are any Edge Depressions / Edge Trips visible?
-
Measurement from profiler:
-
Are any Surface Crowning/Depressions visible?
-
Measurement from profiler:
-
Are all edges saw cut?
-
Comments:
-
Has all overcuts been sealed (if any)?
-
Comments:
-
Any 150/250/300mm Rule?
-
Comments:
-
Is all Iron Work set correctly?
-
Comment:
-
Is Overbanding OK (if used)?
-
What type has been used? MUST BE HAPAS APPROVED i.e. Stirling Lloyd, Colas or Instamac.
-
Comments:
-
Have all road markings/special surfaces including street furniture i.e. signs and bollards been replaced?:
-
Comment:
-
Add media
-
Is site free from damaged surfaces? (i.e. scarring, broken flags,blocks,edgings and kerbs etc):
-
Comment:
-
Picture of damage:
-
Any failures must be complete within 17 days of audit date. Any remedials not complete will carry a charge.
-
Please complete by:
-
Any other comments:
-
Signature: