Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • This is to be filled out for all Temporary Jobs completed by Maintenance or Production Staff.
    Temporary repairs cannot consist of tape,cardboard,non-metal detectable cable ties, rope or wood.
    A temporary repair is not a permanent solution and may be required of waiting for labour, parts etc.
    All temporary repairs will be assesses for food safety risk with permanent repair applied as to risk:
    HIGH RISK - Above Food Stream-24 Hrs
    MEDIUM RISK - Adjacent to food stream - 5 working days
    LOW RISK - Below food stream - 25 working days

  • Site

Temporary Repair Log

  • Date and time of repair.

Repair Description.

  • Exact Location of repair ?

  • Enter photo

  • Detailed description of repair ?

  • Materials used in repair ?

  • Risk?

  • Enter photo

  • Repair Applied by : Name and signature

  • Food Safety Signoff:

  • Complete this register by allocating an action to the appropriate person to make a permanent repair on this item. This can be done by pressing the "paperclip" in top right of the signature block. The due date for the action is to be as per the Risk timeframe. eg. 24hrs/5working days/25 working days.
    Note:this action can be for yourself or another person. You then sign as the responsible person for following up that action.

  • Sign off that a permanent repair action has been allocated to the appropriate person.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.