Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
RESCo Energy Inc. requires that all materials be inspected daily before workers leave the site. The RESCo Energy Inc. site supervisor will conduct and document a daily Material Securement Checklist in the table below. This document will be turned in to management when completed
-
Check for applicable issues with materials before leaving site at the end of day.
Person inspecting materials must sign-off at the end of this document
Project Details
-
Inspection Date
-
Project Name
-
Person conducting inspection
Site trailer and surrounding area
-
Site trailer locked and windows closed
-
Explain
-
Add media
-
All materials secured
-
Explain
-
Add media
-
Area clear of tools
-
Explain
-
Add media
-
Area clear of debris
-
Explain
-
Add media
-
Fencing around area secured
-
Explain
-
Add media
-
Job safety board documents up to date
-
Explain
-
Add media
-
Power unplugged to roof
-
Explain
-
Add media
Scaffolds
-
Deck cleared of materials
-
Explain
-
Add media
-
Fencing secured at base and locked
-
Explain
-
Add media
-
Tagged and legible
-
Explain
-
Add media
-
Planking secured to frame
-
Explain
-
Add media
-
Signs in place
-
Explain
-
Add media
-
Frame secured to building
-
Explain
-
Add media
Housekeeping
-
General garbage cleaned up
-
Explain
-
Add media
-
Crating materials tied up
-
Explain
-
Add media
-
Packing materials cleaned up
-
Explain
-
Add media
-
Cut offs picked up & secured
-
Explain
-
Add media
-
General debris cleaned up
-
Explain
-
Add media
Materials
-
Cable tray secured
-
Explain
-
Add media
-
Wire trough secured
-
Explain
-
Add media
-
Wire secured
-
Explain
-
Add media
-
Plywood secured
-
Explain
-
Add media
-
Panels secured
-
Explain
-
Add media
-
Racking secured
-
Explain
-
Add media
-
Built frames secured
-
Explain
-
Add media
-
Job boxes secured
-
Explain
-
Add media
-
Electrical equipment secured
-
Explain
-
Add media
-
Tools secured
-
Explain
-
Add media
-
Equipment secured
-
Explain
-
Add media
-
Screws not laying around
-
Explain
-
Add media
-
Guardrails and bump lines secured
-
Explain
-
Add media
Corrective Action
-
Corrective Actions
-
Name of Supervisor Contacted
-
Signature of worker completing inspection
-
Weather info