RESCo Energy Inc. requires that all installations be inspected daily before workers leave the site. The RESCo Energy Inc. site supervisor will conduct and document a daily Quality control issues in the table below. This document will be turned in to management when completed.
-
Check for applicable quality issues with the installation before leaving site at the end of day.
Person inspecting must sign-off at the end of this document
Site Details
-
Inspection Date
-
Project Name
-
Person conducting inspection
Racking and Ballast
-
Racking installed as per drawings
-
Explain
-
Add media
-
All hardware secured
-
Explain
-
Add media
-
Roof protection in place under racking
-
Explain
-
Add media
-
Area clear of debris
-
Explain
-
Add media
-
Ballast installed as per drawings
-
Explain
-
Add media
-
Joiner plates installed and torqued
-
Explain
-
Add media
Module Installation
-
Modules free of damage
-
Explain
-
Add media
-
Racking base clamps secured square and torqued
-
Explain
-
Add media
-
Wind deflector clamps secured to module and torqued
-
Explain
-
Add media
-
Modules clamped square to wind deflector
-
Explain
-
Add media
PV Wiring
-
Wiring free of visible damage
-
Explain
-
Add media
-
Wiring dressed up off of roof deck
-
Explain
-
Add media
-
PV connectors installed correctly
-
Explain
-
Add media
-
Correct wire labels installed
-
Explain
-
Add media
-
Inter row jumpers installed correctly
-
Explain
-
Add media
Combiner Box Installation
-
Combiner boxes installed securely
-
Explain
-
Add media
-
Combiner box locations confirmed to not cause shading
-
Explain
-
Add media
-
All penetrations sealed to prevent moiture from entering
-
Explain
-
Add media
-
Combiner boxes free of debris
-
Explain
-
Add media
-
Wiring labelled correctly
-
Explain
-
Add media
-
All connectios torqued and marked
-
Explain
-
Add media
Cable tray and teck cable
-
Cable tray installed with sufficient supports
-
Explain
-
Add media
-
TECK cable run neatly and dressed at correct intervals
-
Explain
-
Add media
-
Cable tray secured to side of building properly
-
Explain
-
Add media
-
Cable tray covers secured
-
Explain
-
Add media
-
Teck cable terminated with proper connectors
-
Explain
-
Add media
Inverter pad and AC
-
Components installed correctly as per drawings
-
Explain
-
Add media
-
Conduit entries sealed
-
Explain
-
Add media
-
Wiring as per drawings
-
Explain
-
Add media
-
Proper wire connections used torqued and marked
-
Explain
-
Add media
-
Cabinets free of debris
-
Explain
-
Add media
Corrective action
-
Corrective Actions
-
Name of Supervisor Contacted
-
Signature of worker completing inspection
-