Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

General

  • RESCo Energy Inc. requires that all installations be inspected daily before workers leave the site. The RESCo Energy Inc. site supervisor will conduct and document a daily Quality control issues in the table below. This document will be turned in to management when completed.

  • Check for applicable quality issues with the installation before leaving site at the end of day.

    Person inspecting must sign-off at the end of this document

Site Details

  • Inspection Date

  • Project Name

  • Person conducting inspection

Racking and Ballast

  • Racking installed as per drawings

  • Explain

  • Add media

  • All hardware secured

  • Explain

  • Add media

  • Roof protection in place under racking

  • Explain

  • Add media

  • Area clear of debris

  • Explain

  • Add media

  • Ballast installed as per drawings

  • Explain

  • Add media

  • Joiner plates installed and torqued

  • Explain

  • Add media

Module Installation

  • Modules free of damage

  • Explain

  • Add media

  • Racking base clamps secured square and torqued

  • Explain

  • Add media

  • Wind deflector clamps secured to module and torqued

  • Explain

  • Add media

  • Modules clamped square to wind deflector

  • Explain

  • Add media

PV Wiring

  • Wiring free of visible damage

  • Explain

  • Add media

  • Wiring dressed up off of roof deck

  • Explain

  • Add media

  • PV connectors installed correctly

  • Explain

  • Add media

  • Correct wire labels installed

  • Explain

  • Add media

  • Inter row jumpers installed correctly

  • Explain

  • Add media

Combiner Box Installation

  • Combiner boxes installed securely

  • Explain

  • Add media

  • Combiner box locations confirmed to not cause shading

  • Explain

  • Add media

  • All penetrations sealed to prevent moiture from entering

  • Explain

  • Add media

  • Combiner boxes free of debris

  • Explain

  • Add media

  • Wiring labelled correctly

  • Explain

  • Add media

  • All connectios torqued and marked

  • Explain

  • Add media

Cable tray and teck cable

  • Cable tray installed with sufficient supports

  • Explain

  • Add media

  • TECK cable run neatly and dressed at correct intervals

  • Explain

  • Add media

  • Cable tray secured to side of building properly

  • Explain

  • Add media

  • Cable tray covers secured

  • Explain

  • Add media

  • Teck cable terminated with proper connectors

  • Explain

  • Add media

Inverter pad and AC

  • Components installed correctly as per drawings

  • Explain

  • Add media

  • Conduit entries sealed

  • Explain

  • Add media

  • Wiring as per drawings

  • Explain

  • Add media

  • Proper wire connections used torqued and marked

  • Explain

  • Add media

  • Cabinets free of debris

  • Explain

  • Add media

Corrective action

  • Corrective Actions

  • Name of Supervisor Contacted

  • Signature of worker completing inspection

  • Weather info

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.