Information

  • Document No.

  • Audit Title

  • Conducted on

  • Location

Traffic Management

  • Hold Point released and Approved TCP available and on site

  • Traffic control set up is according to the approved TCP

  • Does the contractor have the approved ROL & SZA with Hold Point signed on site

  • UHF Channel selected and communicated (Channel number)

  • Are queue lengths been monitored

  • Contractor carried out regular inspection on traffic control set up

  • Is the road surface travelled through, around or past the work site satisfactory?

  • General comments.

  • Traffic Management set up

OHS & Risk Management

  • All personnel at site have been inducted and signed on induction sheet

  • Have Green Card or appropriate induction tickets been sighted

  • Contractor carried out regular safety inspections using suitable checklists

  • Records of toolbox talks available

  • Emergency procedures available on site

  • SWMS available on site

  • All personnel are equipped with appropriate PPE

  • Reversing alarms and revolving lights of all plant are working

  • Daily plant inspection records are completed prior to commencement of work.<br>Reversing Alarms and revolving lights are operational

  • First Aid Kits and Nominated First Aiders are available on site

  • Are Fire Extinguishers readily available on site

  • Add any Comments

ENVIRONMENTAL MANAGEMENT

  • Contractors or Sub Contractors Environmental Control Checklists are available and being used, <br>I.e. Waste Management Register

  • Contractor has completed a Environmental inspection prior to commencing and regularly during works

  • Are all Erosion and Sediment Controls adequate .<br>I.e. stockpile is bunded

  • Are spill kits available on site

  • Is the site and surrounding area free from waste, litter and rubbish at the end of the work

SPRAY SEALING ACTIVITIES

  • Has a site inspection being conducted

  • Sub contractors Spray Sealing Checklist and ITP's are available and being completed

  • Resource levels are adequate and in accordance with Contractors Project Plan

  • Pavement Preparation ( I.e. Surface has been swept no less than 300 mm beyond the edge of the area to be sprayed )

  • Has adequate protection of services and road fixtures been completed <br>I.e. cover grates hydrants bridge or culvert decks

  • Have temporary pavement markers been installed in accordance with the project requirements

  • Pavement temperature is above minimum level for 1 hour prior to sealing<br><br> ▶ Must be no less than 10 deg C for Cutback Bitumen<br><br>▶ Must be no less then 20 Deg C for Polymer Modified binder with Scrap Rubber<br><br>▶ Must be no less than 25 Deg C for Polymer Modified Binder <br>

  • Binder temperature is above minimum level for 1 Hour prior to sealing.<br><br>▶ Class 170 160 to 190 Deg C <br>▶ Multigrade 600/170 160 to 190 Deg C <br>▶ Class 320 170 to 200 Deg C <br>▶ Polymer Modified Binder. 100 to 240 Deg C

  • Are current or prevailing weather conditions suitable for sealing ,<br>I.e. Sealing will not commence if pavement is wet , rain appears imminent , strong winds or dust storms

  • Has a protective strip of heavy paper being applied at the commencement and finish of each spray run

  • Have allocated spray rates been measured and achieved

  • Have longitudinal spray runs been overlapped by no less than 50mm

  • Has contractor or sub contractor prevented settlement of dust, penetration of moisture and drying out of pre-coating agent at the stockpile .

  • Has Aggregate been distributed uniformly - Visual check

  • Has aggregate been spread at the targeted rate

  • Is aggregate firmly embedded into binder,

  • Was rolling conducted using either a duel axel multi tyre roller or a combination of multi tyre and drum roller

  • Did rolling commence no later then 5 minutes for Polymer Modified Binder

  • Did rolling commence no later then 15 minutes for Cutback Bitumen

  • Was back rolling carried out for a minimum period of 1hour per 1000m2 for roads having traffic volume of less than 500 vehicles per lane per day

  • Was back rolling carried out for 1hour per 1500m2 for other roads, up to a maximum of 24 hours after aggregate has been applied

  • Was sufficient sweeping to remove loose aggregate conducted by street sweeper or a tractor mounted broom

  • For 10 mm and 14 mm reveals, did the sub contractor monitor loose aggregate and undertake additional sweeping if rate is higher than,<br>▶ 20 Particles per m2 for Urban Areas<br>▶ 30 Particles per m2 for Med - High traffic > 250 v/l/d<br>▶ 40 Particles per m2 for low traffic < 250 v/l/d

REINSTATEMENT OF DELINEATION

  • Temporary delineation provided at end of work shift prior to opening to traffic

  • Temporary delineation maintained until line marking and RPM's reinstated

  • After care signs have been installed as per contractors Project Plan

  • Lines reinstated within two weeks and RPM's reinstated within two to four weeks

QUALITY

  • Activity appropriate

  • Are RMS Specifications being adhered to

  • Work method conformed to activity guideline procedure

  • Material conformance

  • Have All Hold Points been released

  • Lot conformance and traceability being controlled

  • Has any NCR's been raised

  • Have NCR's raised been closed out

  • Add any Comments

Other worksite Hazards or Comments:

Recommendations:

  • Enter comments or recommendations;

  • Contractors Performance

  • Signature of auditor:

  • Signature of site supervisor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.