Title Page
-
Conducted on
-
Prepared by
-
Site address
-
Enter the floors this report will cover
Inspection Report
-
Enter the floor location
-
Take a picture of the item
-
Describe the residual risk
-
An example would be: Dark areas to old toilets cores where the services have been removed and there is no natural lighting. Or Change in floor level where the RAF has been removed and there is a step down from the central cores onto the floors.