RISK ASSESSMENT AND METHOD STATEMENT
-
Type of Site
-
Completed By
-
THIS SURVEY IS TO BE COMPLETED BEFORE THE HEALTH & SAFETY SITE FOLDER IS CREATED FOR LARGER PROJECTS.
THIS SURVEY MUST BE USED TO HELP COMPILE AN ACCURATE AND DETAILED SITE HEALTH & SAFETY FOLDER.
THIS SURVEY IS TO BE COMPLETED FOR ALL TYPES OF WORKS SO THAT WE CAN ENSURE ALL EMPLOYEES AND THOSE THEY WORK AROUND REMAIN SAFE.
THIS SURVEY IS TO BE ADDED TO THE HEALTH & SAFETY FOLDER.
LOCATION DETAILS
-
Assessment Carried Out By:
-
Date:
-
Site Location:
-
Description of Works to be Carried Out:
RISK ASSESSMENT
-
REFER TO THE LIST BELOW SELECTING THE AREAS WHICH MAY BE A RISK.
ONCE A SELECTION HAS BEEN MADE YOU MUST WRITE IN DETAIL THE POTENTIAL RISKS ASSOCIATED WITH THE ITEM SELECTED. -
RA001 - Asbestos
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
Method Statement
-
RA002 - Brick / Block Work
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
Method Statement
-
RA003 - Cartridge Operated Fixing Tools
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
Method Statement
-
RA004 - Confined Spaces
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
Method Statement
-
RA005 - Demolition
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA006 - Driving at Work
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA007 - Dust & Fumes
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA008 - Excavations
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA009 - Excavators
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA010 - Falling Objects
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA011 - Fire & Explosion
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA012 - Fork Lift Trucks
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA013 - Fragile Roofs
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA014 - Gin Wheels
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA015 - Hand Tools
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA016 - Working at Heights
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA017 - Highways
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA018 - Hot Works
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA019 - Industrial Roofs
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA020 - Violent / Dangerous Occupants
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA021 - Ladders
-
WARNING - CERTAIN SITES WILL NOT ALLOW WORKING AT HEIGHTS VIA LADDERS.
CONFORM WITH THE CLIENT IF LADDERS ARE ACCEPTABLE.
MAKE CONSIDERATIONS FOR TRAINING AND HARNESS'S. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA022 - Lifting Gear
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA023 - Lone Working
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA024 - LPG
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA025 - Machinery
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA026 - Manual Handling
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA027 - Mobile Elevated Platform Works
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA028 - Mobile Cranes
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA029 - Mobile Masts
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA030 - Mobile Plant
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA031 - Noise at Work
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA032 - Openings
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA033 - Overhead Power Lines
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA034 - Breaking into Pipelines
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA035 - Pneumatic Tools
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA036 - Portable Electric Appliances
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA037 - Public On-Site
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA038 - Site Staff
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA039 - Scaffolding
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA040 - Sharpe Edges, Nails etc.
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA041 - Slips Trips & Falls
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA042 - Vulnerable Persons
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA043 - Step Ladders
-
WARNING - CERTAIN SITES DO NOT ALLOW USE OF STEP LADDERS.
IF THIS IS THE CASE HOP-UPS MUST BE USED. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA044 - Tower Cranes
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA045 - Tower Scaffolds
-
WARNING - IT IS A MANDATORY REQUIREMENT THAT ONLY PERSONNEL WITH PASMA TRAINING WORKS WITH TOWER SCAFFOLDING.
IT IS ACCEPTABLE FOR THE TOWER TO BE ERECTED BY A PASMA TRAINED OPERATIVE FOR OTHERS TO USE. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA046 - Underground Services
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA047 - Vibration
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA048 - Core Cutting
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA049 - Young Persons
-
WARNING - AUTHORISATION IS REQUIRED BY THE PARENT OR GUARDIAN IN WRITING CONFIRMING THE INDIVIDUAL HAS PERMISSION TO ATTEND SITE.
A COPY OF THE LETTER IS TO BE INSERTED INTO THE SITE HEALTH & SAFETY FOLDER AND EMAILED DIRECT TO THE CLIENT. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA050 - Electricity
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
METHOD STATEMENT
-
A DETAILED DESCRIPTION OF HOW THE WORKS ARE TO BE COMPLETED MUST BE NOTED BELOW.
-
Detailed Description of Method Statement:
HSNO
-
SELECT FROM THE LIST BELOW SELECTING THE AREAS WHICH MAY BE A RISK:
-
Silicon Based Products to be Used?
-
INSERT THE HSNO REPORT INTO THE HEALTH & SAFETY SITE FOLDER.
-
Will Dust be Present or Created by these Works?
-
INSERT THE HSNO REPORT INTO THE HEALTH & SAFETY SITE FOLDER.
-
Will there be a Requirement to Use Expanding Foam?
-
INSERT THE HSNO REPORT INTO THE HEALTH & SAFETY SITE FOLDER.
-
Please List any Other Hazardous Substance:
-
Please list preventative measures following key HSNO controls including: PPE Fire extinguishers Signs Approved handler Location test certificate Hazardous atmosphere zones Emergency response plan Secondary containment (bunding).
PPE Required
-
Dust mask?
-
Gloves?
-
High visibility clothing?
-
Knee pads?
-
Safety glasses?
-
Safety foot wear?
-
Safety work wear?
-
VDE Approved clothing?
Health and Safety
-
Fire Extinguisher?
-
First Aid Kit?
-
Lock off and tag kit?
-
Testing equipment?
-
Proving unit?
SPECIAL REQUIREMENTS
-
PLEASE DETAIL ANY SPECIAL REQUEST FOR THE WORKS OR WHICH MAY BE A REQUIREMENT TO COMPLETE THIS PARTICULAR PROJECT
-
Please Detail any Special Requirements:
POINTS TO REMEMBER
-
All Personnel have the Correct Competency Card?
-
All Personnel have an understanding of the dangers associated with asbestos?
-
A Plant certified and tested?
-
PAT Testing of All Electrical Equipment has either been Completed prior to starting or a date has been arranged?
COMPLETED BY:
-
Print & Sign
-
PLEASE INCLUDE THIS REPORT AS PART OF THE HEALTH & SAFETY FOLDER.