Title Page
-
Customer Name
-
Postcode
-
Conducted on
-
Prepared by
-
Location
Roof Works
Photo's Pre-Installation
-
Pictures of all roofs before you start
-
Are there any existing damages on the roof
-
Take photo of existing damages
-
Pictures of scaffolding and scaffolding tag
-
Photo of the roof tile showing a Width and Height Measurement x2 Photos
Photos DURING Installation target roof one
-
Pictures of roofs hooked and railed
-
Pictures of rafters
-
Picture(s) of DC cable point entry
Photos Post-Installation
-
Pictures of exclusion zones around the array
-
Photo of all the rails cut at exactly 50mm past the end clamps
-
Pictures of complete arrays
-
Pictures underneath panels showing PV cable ties being used.
-
Does the job have bird spikes
-
Pictures of Bird Protection properly trimmed.
-
Does the system have an optimizer(s)?
-
Take a picture of all Optimizer serial numbers and make a note of where they are in a array (must draw a picture)
-
Example photo of optimizer layout - (Instead of numbers I need serial numbers of the optimizer to the corresponding panel)
-
Has any damaged occurred during the install on the roof
-
Note the damages and how they were repaired
-
Photo of the system from the ground
Declarations and Proof
-
I confirm I have visually inspected the DC cables including exit to panels through roof tiles and confirm there are no damages? (other than minor superficial scratches)
-
I confirm I have visually inspected the roof, panels and cables for damage and mechanical/UV protection?
-
I confirm there are no cables or connectors resting on roof tiles and all are properly fixed to structures in accordance to the manufacturers?
-
I confirm any damages incurred during installation have been rectified
-
I confirm the roof is water tight and there are no leaks or potential entries for water ingress - post installation
-
I confirm all mess made during install has been cleaned and the site has bee left in a safe state (take a pic of site post installation)
-
Have you left the ladder guard on the ladder when leaving site to ensure no-one can access the scaffolding ?
Roofer sign off
-
I confirm this installation has been installed within MCS guidelines, the layout on the roof is neat and tidy, and any damage caused to the roof has been repaired or notified to Sunsave.
-
Roofer signature