Information
-
Client/Site
-
Document No.
-
Project Description
-
Conducted on
-
Prepared by
-
Location
site information
-
Forman
-
Project Manager
check applicable anticipated or potential hazards
-
Demolition/Tear-off
-
Chemicals
-
What Chemicals
-
Activities in or near traffic areas
-
Environmental Hazards (Hot, Cold, Wind)
-
Other (specify) :
critical procedures: where work involves any of the following hazards must be incorporated into JSA
-
Electrical/Mechanical lockout (live, isolation, lock out / tag out
-
Potential Hazards
-
Safety Controls
-
Heavy equiptment lifting (cranes, boom trucks, excavators)
-
Potential Hazards
-
Safety Controls
-
Hot work (in potentially explosive atmosphere)
-
Potential Hazards
-
Safety Controls
ensure all hazards identified are addressed in JSA below
-
Set up Job
-
Type of Fall Protection
- Cable system
- Flagging
- Roof Monitor
- PFAS
- Other
-
Type if 'other'
-
installed correctly, when removed use PFAS
-
6ft from edge, flagging stays tight, when removed use PFAS
-
Roof monitor has no other job and is on the same level
-
Anchors can hold 5000lbs, system is not overloaded, all parts have been inspected
-
Type of Access
-
At 4 to1 angle, 4 rungs above the platform, tied off
-
Scaffold inspected and has top rail, mid rail and toe board
-
Use handrails, no horseplay
-
1. Tear Off
-
Potential Hazards
-
Safety Controls
-
2. Deck Replacement
-
Potential Hazards
-
Safety Controls
-
3. Install new system
-
Potential Hazards
-
Safety Controls
-
Clean up
-
Pick up all trash, roll up cords, secure loose items, do final walk to make sure area is clean
-
Watch for slip, trip, fall hazards, when removing fall protection keep minimum employees on roof and they must stay 6ft from the edge.
-
Other
Emergency Protocols
-
Evacuation procedure
-
Tornado procedure
-
In case of fire
-
Off site Medical
-
Urgent Care
-
Hospital
-
In case of fall
additional PPE ( minimum requirement: safety boots, hard hat, visi-vest, glasses, gloves)
-
Eye protection
-
What kind
-
Hearing protection
-
Fall protection
-
Other specify :
Signatures
-
Safety
-
Project Manager
-
Foreman
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker
-
Worker