Project Information
-
Form Type:
-
Attendance Date:
-
Client:
Store Details
-
Store Name:
-
Store Number:
-
Location:
Project Number(s)
-
Client Project Number:
-
Key Project Number:
Operatives
-
Primary Roofing Operative (Full Name):
-
Secondary Roofing Operative (Full Name):
Health & Safety Checklist
Health & Safety Checklist
-
Is a permit or third party authorisation required to access to the roof?
-
Is a permit or written authorisation in place?
-
Do not access the roof
-
Provide contact details for permit / authorisation to be obtained (Name, Email Address, Contact Number, Documents Required)
-
Is the asbestos register available?
-
Review asbestos register
-
Has the RAAC registers been checked?
-
Can the roof be accessed safely?
-
If the roof cannot be accessed what further measures are required?
-
Is temporary fall protection required and available?
-
What fall protection is in place?
- Parapet Wall(s)
- Wall(s)
- Fence(s)
- Handrail
- Roof Rail
- Safety Line
- None Present
-
Does the safety line have an in date Inspection Tag
-
Do not use the safety line
-
Is temporary fall protection required and available?
-
Is a harness and lanyard required and are they available?
-
Is a MEWP required to carry out the work?
-
Are MEWP operators IPAF trained?
-
Are there any fragile surfaces?
-
What precautions to prevent falls are in place?
-
Do the weather conditions fall within limits stated in RAMS?
-
Have all operatives been briefed on the RAMS?
-
Can materials be taken to the roof safely?
-
Is all waste removed from the roof?
Safety Line Inspection
-
Make / Manufacturer
-
Date of last inspection
-
Photograph of Inspection Tag
Condition
Base Plates
-
Quantity
-
Max kg
-
General comments on the overall condition
Safety Line
-
General comments on the overall condition
-
Pass or Fail (If pass, photograph of new inspection tag)
Sign Off Sheet
Checklist
-
Works completed
-
Photographs taken
-
Test certificates
-
Install complete
-
Works signed-off
Work Times
-
Travel Time (Hours)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Time on site
-
Time off site
Works Undertaken
-
Description of works carried out
-
Material used
-
Plant used
-
Is additional works required
-
In-depth description of additional works required:
Signatures
-
Store representative
-
Key representative