Title Page
-
Conducted on
-
Conducted by
-
Machine Number
-
Office/Accomadation
-
- New MHQ
- Old MHQ
- New Supply chain Office
- MOVCON/Aviation
- Level 1 Clinic area
- TCC
- Level 2 hospital
- LFE Level 1 hospital
- IMDAD camp
- Laundry
-
- MSA-1 (new)
- MSA-1 (Old)
- MSA-2
- MSA-3
- MSA-4
- MSA-5
- MSA-6
- T-Area
- R-Area
- TCC
- GYM
- UNISFA PX
- Level 2 Hospital
- LFE Level 1 hospital
- IMDAD Camp
- Fellowship Church
- Catholic Church
- Mosque
- GCC Cafeteria
HVAC
-
Inspect the air filter, evaporator coil and blower are clean
-
Inspect for visible refrigerant leaks on copper tube, suction and liquid line
-
Inspect wiring, control unit (PCB), power cable and plug
-
Inspect the remote control
-
Check Cooling Effect
-
Inspect the condenser coil and any damage
-
Inspect the drain line and P-trap
-
Observed the any abnormal noise from outdoor unit and indoor unit
-
Check the drawing amps and voltage