Title Page
-
Conducted on
-
Prepared by
-
Location
Daily Checks
-
Backwash of all sand filters done
-
Backwash of the activated carbon filters done
Check levels in chlorine tanks
-
Chlorine levels with in limit
-
Action taken to keep it within limits
Check levels in aluminium sulfate tank
-
Are levels with in limits
-
Action taken to keep it within limits
Check levels in the antiscalant tank
-
Are levels with in limits
-
Action taken to keep it within limits
-
Discharge of the cyclone done
-
Check SP01
-
Check the water production
-
Carry out water analysis
-
Flushing membranes
-
Check EV 06
Weekly Activities/Checks ( To Be done Every Sunday)
-
Prepare Brine(chlorine)
-
ECG01 cleaning
-
RF Filter backwash
Monthly Activities/checks ( To be done on every 1st of every month)
-
Service the compressor
-
UV lamp replacement
-
Part Number -
-
Trailer
-
Water Tanks cleaning
-
Clean BF 01
-
Membrane chemical cleaning(CIP)
-
Change of Micron Filter (Please attach Image)
-
Part Number
-
Pumps maintenance
Yearly Activities/Checks
-
Media replacing
-
Part Number
-
Check flex pipes
-
Action taken
-
Remineralisation media change
-
Membrane replacement
-
Membrane conservation
-
Water Tanks repairs
-
Plant refurbishment(painting)