Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • ROOM NUMBER

Room Handover

Basin

  • Is the appearance completed?

  • Is the drainage operating smoothly without any water leakage?

  • Hand basin stopper condition

  • Hot water temperature

Shower

  • Is the showerhead operating appropriately?

  • Is the floor drain operating appropriately?

  • Air-tight floor drain flip condition

Closet / Wardrobe

  • Is the appearance completed?

  • Is the installation correctly done?

Bathroom / WC

  • Is the floor drain operating smoothly?

  • Are water tank accessories installed completely?

  • Can the ball float valves openclose appropriately?

  • Is water supply operating appropriately?

  • Is the drainage operating smoothly?

Pipe Shaft

  • Shaft Hygiene good without odours

  • The valve is free from water leakage?

  • Is thermal insulation installed completely?

  • Is the ground drainage operating smoothly?

Air Conditioning

  • Fan coil unit - is silent or within audible tolerance especially at nights

  • Supply air louver installation & appearance

  • Return air louver installation & appearance

  • Return air grille filter clean and unobstructed

  • Sufficient access in return air plenum for maintenance

  • Air tightness of supply air duct

  • Can fresh air control valve work?

  • Can exhaust air control valve work?

  • Thermostat control works accurately

  • Solenoid valve operation noise free and operational

  • Status of blower and motor

  • Cooling water/space heating water supply and return valve

  • Condition of drain pan

  • Can the condensing water be drained out smoothly?

  • Pipes with out any visible leaks

  • Pipework Thermal insulation condition

  • Ductwork Thermal insulation ductwork

  • Access opening sufficient for maintenance

  • Supply air temperature
  • Thermal insulation inside pipe shaft

  • Access to FCU motor and blower for future maintenance

Electricity

  • MCB

  • ELV control box

  • Doorbell

  • Key card slot of power energization

  • On/Off switch

  • Ceiling mounted lightings

  • Do Not Disturb Panel (linkage with doorbell)

  • Power sockets including 24 Hour sockets

  • Bathroom socket

  • Bathroom ceiling light

  • Mirror with anti-fog & heating

  • Light trough behind the washbasin mirror

  • Wardrobe light & micro-switch

  • Bedroom ceiling Reading Light in working condition

  • Pendant lamp at Writing Desk area

  • Bedside Light in working condition

  • Night light

  • Doorplate light

  • Earthing connection inside bathroom

  • Earth leakage protection

  • TV Socket & TV

  • Telephone socket & telephone

  • Electric kettle & socket

  • Alarm clock

  • Internet socket and WiFi Signal Strength

  • Multi-functional socket

  • Internet & TV signals test

  • Mini-bar and its socket

  • Electronic safe

Decor

  • Door frame, veneer finishing, door hinge

  • Door closer installation

  • Door lock installation

  • Door chain, Door pothole installation

  • Door drop sealed strip (bottom of the door)

  • Door number and fire evacuation plan

  • Doors installation

  • Protective strip installation at door frame

  • The door is deformed or not

  • The door is smooth to operate or not

  • Door lock installation BLE

Decor 2

  • Kiblat signage direction

  • Guide rail installation if any

  • Ceiling painting

  • Wall covering

  • Wall and ceiling woodwork

  • Carpet

  • Headboard and soft padding installation

  • Skirting

  • Desk

  • TV console

  • Mini bar cabinet

  • Luggage rack

  • Bed base

  • Artwork

  • Full height mirror

  • Curtain pelmet

  • Curtain, curtain rail and rod

  • Cover for socket on desk

  • Sofa, tea table, night stand

  • Chair or Sofa (Day Bed)

  • Curtain wall glass, window, window handle and lock

  • Corridor floor marble and bay window/window sill marble

  • Closet wood veneer finishing

  • Closet door protective strip installation

  • Closet shelf and hanging rod

  • Closet door hinge, handle and stopper

  • Closet drawer and guide rail installation

  • Cover panel finishing for the power distribution box

  • Floor condition

Bathroom and Shower

  • Glass door stopper and weather-strip installation

  • Glass door hinge and door handle

  • Glass partition sealant

  • Built in marbel soap dish/shelf

  • Marble cover for shower drain

  • Shower room marble floor

  • Toilet paper holder, clothes hanger and towel rack

  • Wash basin vanity marble

  • Vanity top edge sealant work

  • Vanity mirror

  • Side make up mirror installation

  • Bathtub edge sealant work

  • Bathtub marble edge sealant work

  • Bathtub handrails

  • Bathtub maintenance panel

  • Clothes hanging line installation

  • Shower and wc enclosure and door installation

  • Bathroom ceiling painting condition

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.