Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Property Details

  • Property type

  • Connected properties?

  • Connected Properties?

  • How many floors to the building?

  • Elevation Photographs

  • Heating Type

Installation details

  • Date insulation was installed and completed

  • Installation operatives

  • Have all avoidable thermal bridges/heat loss areas which could have been insulated, been insulated?

  • Is there a specific reason why areas have been omitted?

  • State reason for omissions and photograph the areas detailing why it was not possible to insulate.

  • Photographs of the area that is believed could have been insulated should be taken and the matter discussed with the Operations Supervisor.

  • Has 100% of the space to be insulated, been successfully insulated?

  • Photographs showing areas of installed insulation within each room.

  • Photographs showing omitted areas to be taken and passed to Operations Supervisor to determine whether or not remedial action is required.

  • Has insulation been installed to all stud walls within the room in the roof?

  • Photographs to be taken of areas that fail to meet the required standard and the matter reported to the Operations Supervisor for remedial action

  • Has insulation been installed to all sloping ceilings within the room in the roof?

  • Photographs taken of areas of concern and the matter reported to the Operations Supervisor, if identified during a C2 inspection the issue is to be raised and discussed with the installers and corrected before completion and handover.

  • Has insulation been installed to the ceiling within the room in the roof?

  • Photographs taken of areas where insulation has not been installed (if visible) and the matter reported to the Operations Supervisor, if identified during a C2 inspection the matter is to be raised with the installers and corrected before completion and handover.

  • Where downlighters or services have been fitted through the existing ceiling, have any measures been taken to prevent air leakage around down lights into the roof void?

  • Photographs taken of areas where gaps have not been sealed (if visible) and the matter reported to the Operations Supervisor, if identified during a C2 inspection the matter is to be raised with the installers and corrected before completion and handover.

  • Are the downlighters safeguarded in accordance with PAS2030?

  • If identified whilst installers are on site this is to be rectified before continuing with the installation, if identified post completion then the matter is to be recorded as a CAT 1 fail and the Operations Supervisor contacted to arrange remedial action.

  • Are any other electrical apparatus penetrating the ceiling which require safeguarding in accordance with PAS2030?

  • Have they been correctly safeguarded to ensure that insulation remains the correct minimum distance from the apparatus and that any service that penetrates the ceiling has been sealed to prevent air leakage?

  • Efforts to be made to make safe and the matter reported to the Operations Supervisor to arrange remedial action, if necessary report it as a CAT 1 Fail.

  • Has insulation been installed to all party walls within the room-in-roof that are either cavity walls or solid walls bordering an unheated space?

  • Photographs taken of areas where it is believed insulation should be installed and the matter reported to the Operations Supervisor, if identified during a C2 inspection the matter is to be raised and discussed with the installers and corrected before completion and handover.

  • Have any tanks or 'live' pipework present in the residual area been insulated?

  • Photographs taken of tank or pipework that requires lagging and the matter reported to the Operations Supervisor, if identified during a C2 inspection the matter is to be raised and discussed with the installers and corrected before completion and handover.

  • Have all hatches installed as part of the room-in-roof insulation been insulated as specified in the relevant annex of PAS?<br><br>In the event that the Room in Roof insulation is being fitted in a loft space which comprises more than one habitable room, the loft hatch and loft hatch insulation must comply with fire regulations and have the required fire rating.

  • Photographs taken of the loft hatch and the matter reported to the Operations Supervisor, if identified during a C2 inspection the matter is to be raised and discussed with the installers and corrected before completion and handover.

  • Has insulation been installed to all gable walls within the room-in-roof?

  • Photograph taken highlighting the gable which requires remedial action and the matter is to be reported to the Operations Supervisor to arrange remedial action.

  • Does the provision of ventilation in the property meet the requirements of the relevant version of PAS2030?

  • State what improvements need to be made to the ventilation within the property.

  • All 'wet' rooms within the property are required to have intermittent extraction ventilations systems (fan). If they are not being insulated then they must also be fitted with a heating system that will achieve 18c or more. If an IEV is not fitted within any of the wet rooms within the property then it must be reported to the Operations Supervisor and the matter discussed to assess how best to proceed with remedial action.

  • Operations Supervisor contacted to discuss the ventilation strategy, photographs taken and notes made to support a case for improving the ventilation within the property.

  • Has the measure been installed in accordance with PAS2030?

  • For what reason?

  • Where required have air supply vents been installed for combustion appliances?

  • Operations Supervisor to be contacted to arrange for CAT 1 Remedial action.

  • Have all flues, chimneys and ventilation air supplies for combustion appliances been safeguarded?

  • Operations Supervisor to be contacted to arrange for CAT 1 remedial action.

  • Is there clearance between the insulation and flues and chimneys in accordance with PAS2030?

  • Where possible insulation should be removed to a safe limit and the matter reported to the Operations Supervisor, if it is identified whilst installers are on site then they are to rectify this before continuing.

  • Has adequate provision been made to safeguard, relocate or provide access to gas/electric/water/telecomms/TV services?

  • Operations Supervisor to be contacted to arrange remedial action.

  • Can all doors and windows still be fully opened?

  • If unable to rectify during inspection then the matter is to be reported to the Operations Supervisor to arrange for remedial action.

  • Are all the air bricks clear of insulation material?

  • If unable to remove obstructions from air bricks then the matter is to be reported to the Operations Supervisor for remedial action, if any air bricks are found to be obstructed during a C2 inspection then it is to be brought to the attention of the installers who must rectify/remedy this prior to completion and handover.

  • Have all essential ventilation openings been safeguarded in accordance with PAS 2030?

  • Photographs to be taken highlighting the issue and the Operations Supervisor is to be contacted to arrange remedial action.

  • Is a walk-board required in the residual loft space?

  • Is one fitted?

  • Photograph showing walk-board

  • Refer to Operations Supervisor to arrange for remedial action to be scheduled.

  • Are warning signs fitted in accordance with PAS2030

  • Operations Supervisor to be contacted to ensure that remedial action is booked to fit notices in relevant areas of the loft space.

  • Photographs of warning notices fitted

  • Do any faults specific to the measure installed present an immediate risk to the occupier?

  • A risk assessment is to be conducted and an effort made to ensure the safety of the customer and the property, the Operations Supervisor is to be contacted immediately to arrange for remedial action to make the property safe.

  • Do you believe that there are no other safety related issues with the installation?

  • Areas of concern should be reported and photographs taken supporting these concerns. Should there be any immediate risk to the occupier or the property then it is to be treated as a CAT 1 Fail, reported and an effort made immediately to ensure the safety of the occupier and the property.

Customer Feedback

  • Was the customer home at the time of the inspection?

  • How would the customer rate their experience of arranging the installation?

  • How would the customer rate the service received by the installers?

  • How likely is the customer to recommend Envo Energy?

  • Customer comments

Inspection Outcome

  • Inspection Outcome

  • Contact Operations Supervisor to highlight problems and book remedial action.

  • Operations Manager and Operations Supervisor to be contacted to ensure that faults are rectified urgently

  • Inspectors Comments

  • Inspectors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.