Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous actions
Previous site action
-
Have previous corrective actions been completed?
Site controls
Review site controls
-
Site entrance.
-
Site signage adequate with appropriate information and directions.
-
Site secure with sufficient controls in place.
-
Plant, equipment and tools stored securely.
Documentation
Review of documentation.
-
Site inductions up to date
-
Risk assessments up to date and appropriate.
-
Method statements up to date and appropriate.
-
Employees briefed on documentation.
-
Employees sign off documentation
-
Employees competencies available.
-
Site register maintained and up to date.
General procedures
General & Emergency procedures.
-
Escape routes clear and unobstructed.
-
Have there been any accidents or incidents?
-
Enter details of accident or incident.
-
First aid box stocked and appropriate.
-
Trained first aider on site
-
Name
-
Permit procedures necessary.
-
Permit types used.
- Working at height
- Excavation
- Live working
- Confined spaces
- Asbestos
- Other
-
Permits used effectively
-
COSHH documentation available.
-
Documentation available.
-
Chemicals adequately controlled.
-
Sub contractors adequately controlled.
Housekeeping
Housekeeping
-
Good housekeeping being observed
-
Walkways free of trip (Alpha) hazards.
-
Goods stored safely to prevent falling onto persons
PPE
PPE
-
Appropriate PPE identified.
-
Good compliance observed.
Working at height
Working at height.
-
Is safe working at height available and by what means. (S)caffold, (T)ower, (P)odium/steps or (M)ewps
-
Is scaffold in good condition and free from defects.
-
Is scaffold inspected and in date. (Scafftag)
-
Loading bays provided, adequate and closed when not in use
-
Are the mobile towers in good condition and correctly erected.<br>
-
Is there someone with PASMA training available
-
MEWPs suitable with appropriate certification available.
-
Appropriate fall protection equipment available and certificated.
-
IPAF trained operatives available.
-
Harnesses and lanyards checked before use and recorded weekly.
-
Are the methods in use appropriate and safe.
-
Ladders in good condition and free from defects
-
Ladders appropriate class (1 or EN 131)
-
Ladder checking procedure in place
Electricity
Electricity
-
110 volt tools and leads used.
-
PAT testing done and up to date.
-
Appropriate arrangements for charging battery tools.
-
Isolations in place where required.
Plant & Equipment
Plant and Equipment
-
Evidence of plant operatives training records.
-
Risk assessment completed for vehicle / pedestrian movements and safety
-
Risk from overhead services controlled.
-
Plant maintained with alarm systems working.
Cranes & lifting operations
Cranes and lifting operations.
-
Risk assessments done for lifting operations
-
Lifting operations planned and supervised by a competent person.
-
Lifting equipment tested and certified.
Excavations
Excavations
-
Risk assessments and method statements completed.
-
Excavations inspected by competent person
-
Excavations protected by barriers
-
Appropriate measures in place to prevent collapse.
Welfare
Welfare
-
Toilets available and clean.
-
Facilities for consumption of food and drinks available and clean.
-
Drinking water available.
-
Drying room available.
-
Washing / showering facilities available.
Waste disposal
Waste
-
Facilities available for the collection and disposal of waste.
-
Waste segregated into streams on site.
-
Environmental controls in place to prevent pollution.
-
Fuel oil adequately stored and bundled.
-
Gas cylinders securely stored.
Summary
Summary
-
Corrective actions required
-
Item 1
-
Item 2
-
Item 3
-
Item 4
-
Item 5
-
Item 6
-
Item 7
-
Item 8
-
Item 9
-
Item 10
Comments.
-
Client signature
-
Select date