iAuditor Mobile App Preview

Audit

SAFE WORK METHOD STATEMENT TEMPLATE

Job description

High risk construction work

other high-risk construction work

Click + to add task involved, risk assosciated with these tasks and control measures

Task involved

Control Measures

Confirmation

Recommendations

Click + to add name of person involved
Full Name, signature and position

Safe Work Method Statement (SWMS) Template Checklist

Created by: SafetyCulture Staff | Industry: General | Downloads: 42

This safe work method statement (SWMS) template outlines the high risk construction work activities to be carried out at a workplace, the potential and existing hazards associated with these activities, and the measures to put in place to control the risks.

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Audit

SAFE WORK METHOD STATEMENT TEMPLATE

Job description

High risk construction work

other high-risk construction work

Click + to add task involved, risk assosciated with these tasks and control measures

Task involved

Control Measures

Confirmation

Recommendations

Click + to add name of person involved
Full Name, signature and position