JOB INFORMATION
-
OSHA 300 forms complete and posted from February 1 - April 30?<br>
-
OSHA and DOL posters posted?
-
Emergency phone numbers posted?
-
Tool box safety talks log up to date?
-
MSDS filed?
-
Work areas properly signed and barricaded?
HOUSEKEEPING
-
Work areas neat?
-
Projecting nails or screws bent over or removed?
-
Waste containers provided and used?
-
Passageways and walkways clear?
-
Cords and leads off the floor?
FIRE PREVENTION
-
Adequate fire extinguishers, checked and accessible?
-
Phone no. of Fire Department posted?
-
"No Smoking" posted and enforced near flammables?
ELECTRICAL
-
Extension wires with bare wires or missing ground prongs taken out of service?
-
Ground fault interrupters being used?
-
Terminal boxes equipped with required covers?
HAND, POWER & POWDER ACTUATED TOOLS
-
Tools and equipment shall be inspected prior to use.
-
Tools and equipment shall be used for the appropriate task.
-
Guards and safety mechanisms shall not be damaged or removed.
-
Damaged tools and equipment shall be tagged "out of service" until they are repaired.
-
Proper lockout/tagout procedures shall be used when necessary to isolate an energy source.
-
Only trained and authorized personnel are allowed to operate skid steers, forklifts, and cranes.
FALL PROTECTION
-
Safety rails and cables secured properly?
-
Safety harnesses worn properly?
-
Fall protection shall be used when work is performed at heights exceeding 6 feet above the next lowest level. Guard rails and personal fall arrest system shall be the primary means of fall protection.
-
Employees below protected from falling objects?
LADDERS
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service?
-
Stepladders used in fully open position?
-
No step at top two rungs of stepladder?
SCAFFOLDING
-
All scaffolding inspected daily?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails, intermediate rails, toe boards and screens in place?
-
Planking is sound and sturdy?
-
Proper access provided?
-
Employees below protected from falling objects?
FLOOR & WALL OPENINGS
-
All floor openings planked over or barricaded?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge?
TRENCHES, EXCAVATION & SHORING
-
Competent person identified and present?
-
Excavations are shored and sloped back?
-
Materials are stored at least 2' away from trench?
-
Ladders provided every 25' in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Proper number of workers for each operation?
WELDING AND BURNING
-
Gas cylinders stored upright?
-
Proper separating distances between fuels & oxygen?
-
Goggles or shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
CRANES
-
Outriggers extended and swing radius barricade in place?
-
Operator is familiar with load charts?
-
Hand signal charts on crane?
-
Crane operator logs up to date?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
CONCRETE CONSTRUCTION
-
When dry cutting concrete, HEPA filter (3M 6200 Series - P100) respirator will be worn.
-
Exposed skin covered?
-
Runways are adequate?
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats shall be worn at all times.
-
Appropriate eye protection shall be worn at all times. Employees wearing prescription glasses shall wear side shields. When cutting or grinding metal, a face shield shall be worn in addition to glasses. Goggles shall be worn when applying glue in the wall and roof build stations.
-
Respirators used when Required?
-
Hearing protection worn when required?
-
Shoes in good working order, with covered toes, and adequate soles for traction and stability.
-
Traffic vests or high visibility clothing material being worn?
Sign Off
-