Title Page
-
Document No.
-
Client / Site ref:
-
Conducted on
-
Prepared by
-
Project Manager/s
Contrat Document Audit
CONTRACT DOCUMENTATION
-
Was the correct contract sent?
-
Was a dilapidation and safety report carried out and documents uploaded to file?
-
Was a Commencement Notice document sent by the required time and uploaded to file?
-
If a variation was submitted, was this done using the correct document format (QBCC or MBQ) and uploaded to file.
-
Number of variations sent?
-
Were any Contractor's written advice sent and copies uploaded to file?
-
Number sent?
-
Were any requests for information sent?
-
Number sent.
-
Was a Practical completion notice sent in the correct format and up loaded?
-
Was a defects document carried out and signed by the customer?
-
Was a completion Certificate actioned with all parties signing as works complete.
-
Was a customer questionnaire carried out and signed by customer and p.m and uploaded to file
Health &Safety Audit
HEALTH & SAFETY DOCUMENTATION AUDIT.
-
Was the contract value above $250,000 requiring a work health and safety plan?
-
Was a safety plan completed and copy uploaded to file.
-
Was a pre works safety audit carried out prior to works commenced on site.
-
Were all subcontractors SWMS received for their specific works?
-
Were all MDS sheets for hazardous materials supplied or made available ?
-
Were all plant operators licences checked?
-
Were site inductions carried out and construction safety induction cards sighted and documents uploaded to file?
-
Were tool box meetings actioned during the course of the works.
-
How many tool box meetings were held?
-
Were any periodic site safety inspections carried out?
-
How many period site safety inspections carried out.
-
Were there any near miss or injury reports carried out?
-
How many near miss or injury reports occurred?
Project Manager compliance Audit
PROJECT MANAGER COMPLIANCE AUDIT
-
Were all contract documentation requirements complied with.
Add items of non compliance
-
Form description.
-
Were all health and safety documentation requirements complied with.
Add items of non compliance.
-
Form description.
-
Is further training required for the Project Manager?
-
Is disciplinary actioned required
Auditors signature.
-
Name of Auditor