PROJECT NAME
-
Project Leader
-
Date
-
The department where system will be installed:
- Production
- Quality
- Pilot Plant
-
Manager of the Department
-
MANUFACTURING LINE
- Line 1
- Line 2
- Common System
-
Additional Observers
-
Additional comments
-
Prepared by:
EQUIPMENT
Equipment #1
-
Name
-
Picture of the piece of equipment
-
ASSES THE RISK - What is the risk level of this system?
PROCESS
-
Are there standard procedures for this job?. If not, what are the action plans? <br> (If not necessary, select N.A)
ELECTRICAL ASSESMENT
-
Has the electrical system been installed according to the electrical plan and drawings? <br><br>Have the electrical hazards been removed. If not describe the problem and take a picture
MECHANICAL ASSESMENT
-
Has the mechanical system been installed according to the plan and layout? <br><br>Have the mechanical hazards been removed or controlled? If not, describe the problem and take a picture
Additional Equipment
-
Is there additional pieces of equipment?
Equipment #2
-
Name
-
Picture of the piece of equipment
-
ASSES THE RISK - What is the risk level of this system?
PROCESS
-
Are there standard procedures for this job?. If not, what are the action plans? <br> (If not necessary, select N.A)
ELECTRICAL ASSESMENT
-
Has the electrical system been installed according to the electrical plan and drawings? <br><br>Have the electrical hazards been removed. If not describe the problem and take a picture
MECHANICAL ASSESMENT
-
Has the mechanical system been installed according to the plan and layout? <br><br>Have the mechanical hazards been removed or controlled? If not, describe the problem and take a picture
Additional Equipment
-
Is there additional pieces of equipment?
Equipment #3
-
Name
-
Picture of the piece of equipment
-
ASSES THE RISK - What is the risk level of this system?
PROCESS
-
Are there standard procedures for this job?. If not, what are the action plans? <br> (If not necessary, select N.A)
ELECTRICAL ASSESMENT
-
Has the electrical system been installed according to the electrical plan and drawings? <br><br>Have the electrical hazards been removed. If not describe the problem and take a picture
MECHANICAL ASSESMENT
-
Has the mechanical system been installed according to the plan and layout? <br><br>Have the mechanical hazards been removed or controlled? If not, describe the problem and take a picture
CLOSE OUT
-
Select date
-
Add signature