Information
-
Client Name
-
Project Name
-
Conducted on
-
Audit Number
-
Prepared by
-
Add location
Previous Report
-
Previous corrective actions
Health & Safety Documentation
-
Is an accident book or incident report forms available on site?
-
Has a PSDP and PSCS been appointed in writing for the project?
-
Is there a suitable Construction Phase Health and Safety Plan available on site, which has been suitably reviewed and updated?
-
Is there an AF1 and AF2 displayed on site with the correct details?
-
Is there an Excavation Register in place along with suitable control measures for excavations on site?
-
Sub-contractor safety information in place. This should include Insurance documents, Health and Safety Policy and competence review system.
-
Has a list of substances on site been made and a copy of all Safety Data Sheets available?
-
Electricity control measures in place for underground, overhead and live systems on the project?
-
Fire & Emergency Procedures in place which includes, fire plan, fire drill, fire points, fire warden etc.
-
Inductions completed for all persons on the project and training records recorded?
-
Permits in place for items such as Hot Works, Roof Works, Excavations around services etc. All permits completed correctly and signed off?
-
Plant & Lifting Equipment Certification in place?
-
Plant Inspection Records in place for daily and weekly checks?
-
Risk Assessments & Method Statements in place for all contractors on the project. RAMS reviewed, signed off and operatives working in line with these?
-
Scaffold Register in place and up to date?
-
Sign In Book available and being used?
-
Statutory Notices in place for the required project?
-
Temporary Works procedure in place, design sign off and Temporary Works Certificate in place?
-
Toolbox Talks completed on a regular basis and records kept?
-
Traffic Management Plan in place detailing traffic routes, pedestrian walkways and key locations for the project?
Site Arrangements
-
Excavations being carried out with suitable control measures in place?
-
Fire Extinguishers / Horn / Alarm present and suitable for the project?
-
First Aid box in place along with trained first aider? Suitable equipment in place for the project scale?
-
Housekeeping maintained to a suitable standard?
-
Lighting suitable at time of audit and if work is being carried out after normal working hours?
-
Portable Appliance Testing carried out and as a minimum tested within the last year?
-
Plant & Machinery suitable and used by competent persons. Valid certification in place?
-
Parking suitable for visitors / contractors / general public and clear sings etc displayed?
-
Podium / Step Ladders used as a last resort and suitable for works being carried out?
-
PPE being worn in line with company and site requirements?
-
Working at Height carried out in a safe and suitable manner?
-
Security in line with site requirements and construction regulations.
-
Signage in line with current regulations and providing clear direction to all staff and general public?
-
Site Fencing / Hoarding suitable for project and inspected on a regular basis?
-
Storage
-
Subcontractor Equipment in suitable condition and checked prior to use?
-
Vehicle / Pedestrian Segregation provided to all sections of the project site?
-
Suitable welfare facilities provided in line with Safety, Health at Work (Construction) Regulations 2013
-
Other
-
Other
Additional Comments
Corrective Actions
-
Corrective Actions required
Sign Off
-
I confirm I have had the contents of this audit explained to me
-
Site Manager
-
Person Conducting The Inspection
-
All corrective actions must be signed off and dated once completed.