Title Page
-
Marcom Communications safety observation record Ver. 1.1
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Description of activity
Tap Connection
-
Has the connection been completed as per NBN specification? (Heat Shrink, Rubber boot, ETC.)
-
Correct labelling?
-
Service loop?
-
Approved parts?
Drop Cable
-
Does the cable meet NBN specification?
-
Correct Height?
-
Correct Depth?
-
Attachment to house?
PCD
-
Is the PCD installed as per NBN standard?
-
Appropriate location?
-
Correct Labelling?
-
Adequately secured?
-
Service loop?
Follow up
-
Is rectification work required?
-
Who is responsible for rectification if required?
Overall observation
-
General Comments
-
Technician signature
-
Supervisor signature
-
Photos attached