Site Address:
-
Job Type
- SDU VPL
- SDU UCG
- MDU VPL
- MDU UCG
- VPL Civil
- UCG Civil
- MDU VPL Build
- MDU UCG Build
- Chorus UFB
- Enable ROW/MDU
- Enable Provisioning Build
- Enable Provisioning
-
SIMPRO/JOB/WORK ID:
-
Field Manager:
-
Technicians
-
Conducted on
-
Site Pass or Fail
Quality Assurance
-
Trench in Soft Surface
-
Please Add Photos
-
Notes:
-
Trench in Hard Surface (i.e. concrete, seal)
-
Please Add Photos
-
Notes:
-
Have the Drop off's/Peg marker installed to Standard?
-
Please Add Photos
-
Notes:
Inside Boundary:
-
Trench in Soft Surface
-
Please Add Photos
-
Notes:
-
Hard Surface Micro Slot-Cut
-
Please Add photos
-
Notes:
-
Trench in Hard Surface
-
Please Add photos
-
Notes:
-
Surface Mount/Fence Line/Clipping
-
Please Add photos
-
Notes:
-
Are the Drop off's pegged/fastened/capped
-
Please Add photos
-
Notes:
-
Is the Pedestal/Gator/Manhole installed to Standard
-
Please Add photos
-
Notes:
-
Site Cleanliness:
-
Please Add photos
-
Notes:
-
Is there any Provisioning Tasks?
-
FTP & conduit installation standard?
-
Please upload photos
-
Notes:
-
Gas blocks installed correctly?
-
Please take photos
-
Notes
-
FTP & ITP fibre management standard?
-
Please take photos
-
Notes
-
Spacing of clips at 300mm & saddles at 600mm max?
-
Please take photos
-
Notes:
-
Capping / Mini Trunking Used?
-
Why is back to back or cavity drop (using existing telephone inside the wall as draw) possible?
-
Take photos
-
Correct materials use?
-
Notes:
-
All other reinstatement completed?
-
Take photos
-
Notes
-
Site Cleanliness:
-
Take photos
-
Notes
Customer Service Experience
-
Was the Customer happy with the completed works
-
Customer comments:
Audit Result:
-
Does the Site Pass or Fail the QA
-
Please select responsible parties
- Crew to Remediate works
- OSB Reinstatement to be completed
Inspected By:
-
Signature: