Title Page
-
Client / Site
-
Post Task QA
-
Conducted on
-
Prepared by
-
Personnel
Quality Assurance
-
FTP / BUDI installation
-
FTP / BUDI Cable Management
-
Fibre / Hybrid / Conduit / Capping Run or installation
-
Attach photos of the above tasks
-
ONT Installation
-
ONT Cable Management
-
VoIP connected to existing phone line and / or RJ45 Jack Installed
-
Attach photos of the above
-
Aerial Lead deployment
-
Aerial Lead at premise
-
Aerial Lead at pole
-
Aerial Lead at pole on multi spans
-
Attached photos of aerial deployment
-
Concrete slot-cut (micro-cutting)
- Yes
- No
- N/A
- Standard
- Non-standard hard surface
- Non-standard soft trench
- ISB
- OSB
-
reinstatement passed
-
Reinstatement completed?
-
Photos of the Slot-cut / Reinstatement
-
Surface mounting / Fence line
-
attach photos of the Surface mounting / Fence line
-
Trenching
- Yes - shallow trench (ISB)
- Yes - standard trench (ISB)
- Yes - standard trench (OSB/boundary)
- Yes - standard trench
- Non - standard (ISB/OSB/boundary)
- N/A
-
Reason for failure
-
Attached photos of trenching & Reinstatement
-
Cable hauling?
-
Draw tape replaced / installed?
- Yes
- No
- N/A
- Standard
- Non-standard hard surface
- Non-standard soft trench
- ISB
- OSB
-
Add media
-
All Approved Materials Used?
-
What are the non-approved materials used?
-
Was the end-customer happy how the task was planned & completed?
-
Non-standard / Non-compliant details
-
Site cleanliness:
-
Add media
-
Inspected by:
-
Audit Rating (out of 20)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Pass or Fail