Title Page

  • Client

  • Site Address & Job ID

  • Conducted on

  • Prepared by

  • Personnel

Quality Assurance

Outside Boundary:

  • Please select works done

  • Please Continue to Next Section

  • Trench in Soft Surface

  • Please Add Photos

  • Notes:

  • Trench in Hard Surface

  • Please Add Photos

  • Notes:

  • Have the Drop off's/Hand Hole/Manhole been installed to Chorus Standard

  • Please Add Photos

  • Notes:

  • Hard Surface Reinstatement

  • Please Add Photos

  • Notes:

  • Soft Surface Reinstatement

  • Please Add Photos

  • Notes:

  • Aerial Works

  • Please Add Photos

  • Notes:

  • Have the Drop off's/IFDB/FAT been installed to Chorus Standard

  • Please Add Photos

  • Notes:

  • Surface Mounting

  • Please Add Photos

  • Notes:

  • Does the OSB works Pass or Fail QA

  • Notes for improvement or Acknowledgment

  • Site Cleanliness:

  • Please Add photos

  • Notes:

Inside Boundary:

  • Please Select Works done

  • Trench in Soft Surface

  • Please Add Photos

  • Notes:

  • Microslot Cut

  • Please Add Photos

  • Notes:

  • Trench in Hard Surface

  • Please Add Photos

  • Notes:

  • Surface Mounting

  • Please Add Photos

  • Notes:

  • Hard Surface Reinstatement

  • Please Add Photos

  • Notes:

  • Soft Surface Reinstatement

  • Please Add Photos

  • Notes:

  • Aerial Works

  • Please Add Photos

  • Notes:

  • Surface Mounting/Cabling

  • Please Add Photos

  • Notes:

  • Has the FTP's/BUDI/IFDB been installed correctly?

  • Please Add Photos

  • Notes:

  • Has Fibre Management at FTP's/BUDI/IFDB been installed correctly?

  • Please Add Photos

  • Notes:

  • Has the ONT been installed correctly?

  • Please Add Photos

  • Notes:

  • Has the Fibre at the ONT been installed correctly?

  • Please Add Photos

  • Notes:

  • Has the VoIP connected to existing phone line and / or RJ45 Jack Installed?

  • Please Add Photos

  • Notes:

  • Have Draw tapes been left for cable hauls?

  • Please Add Photos

  • Notes:

  • Does the ISB works Pass or Fail QA

  • Notes for improvement or Acknowledgment

Audit Results:

  • Site Cleanliness:

  • Please Add photos

  • Notes:

  • Does the Site Pass or Fail the QA

  • Crew to discuss with Manager on how to rectify NCR

Inspected By:

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.