Title Page
-
simPRO Job No.
-
Location
-
Prepared by
-
Vehicle Rego
-
Lead Tech
-
Assistant Tech
-
Conducted on
-
Site Status - (pass or Fail)
Site Observations
-
Would you like to complete a Full Health & Safety Site Observation
-
Is the site meeting safety expectations?
-
Was the Induction helpful or not?
-
Why was the induction not helpful?
-
Have they identified and controlled all of the significant hazards such as utility services?
-
What was the unidentified and uncontrolled significant hazards and how can they be identified easier by the crews next time?
-
Are there any new hazards to consider?
-
Enumerate all the new hazards and add to the job pre-start and hazard register.
-
Was the site tidy or presented well?
-
What could be done to keep the site tidy?
-
Are the techs confident to do the job safely?
-
Why are the techs not confident to do the job safely, and what can be done immediately at site to help them?
-
Complete PPE (As per task requirements)?
-
What PPE was missing and why was this missing?
-
Has the crew explained the task and it's hazards and had control the risks as properly?
-
Was the crew coached and taught to explain the task and it's hazards and had control the risks as properly?
-
Has the job pre-start captured these controls?
-
Did the techs consider other people (public, workers, home owners) when they do their risk assessment?
-
Why did the crew fail to
-
What are the techs considering, for from a safety perspective, when they start the task?
-
Is the vehicle, generator, power tools, hand tools & equipment in safe, tidy and good condition?
Site Safety Interaction snap shot
-
Please list the Good Safety Behaviors?
-
Add Good Safety Behaviors photos
-
Unsatisfactory Behaviors (e.g. hazards, controls and at-risk behavior)
-
add Unsatisfactory Behaviors (e.g. hazards, controls and at-risk behavior) photos
-
Safety Discussion and Immediate Actions required?
-
Photos of rectifications
-
Future Improvements/ Training done on site?
Quality Assurance
-
Would you like to complete a Full Site Quality Assurance Check?
-
Are there any Civil Works involved?
-
Outside Boundary & Boundary reinstatement standard
-
What needs to be remediated?
-
Fence line / surface mounting straight & standard?
-
What needs to be remediated?
-
Shallow trenching straight, correct depth & reinstatement standard?
-
What needs to be remediated and completed?
-
Slot-Cut depth, bends, straight & reinstatement are standard?
-
What needs to be remediated and completed?
-
Slot-Cuts are all inside boundary?
-
Remove all slot-Cuts and move to 300mm inside boundary
-
Is there a Pedestal installation?
-
Was the Pedestal installation standard?
-
What needs to be remediated?
-
All reinstatement completed?
-
Complete all reinstatement before leaving site. If weather dependent, send photos and e,ail to your department and field manager.
-
Are there any provisioning tasks on site?
-
Are the FTP & conduit/s installation standard?
-
What needs to be remediated?
-
Gas block/s installed correctly?
-
Install correct type of gas block/s
-
FTP & ITP fibre management standard and had followed correct bend radius?
-
Re-manage fibre and ensure that the correct bend radius is followed
-
Spacing of clips at 300mm & saddles at 600mm maximum?
-
ensure spacing of clips at 300mm & saddles at 600mm maximum
-
Capping / Mini Trunking Used?
-
If yes, why is back to back or cavity drop (using existing phone wiring inside the wall as draw) possible?
-
Correct materials used?
-
remove all non-approved and incorrect materials then, replace with correct and approved materials.
-
All other reinstatement (anything that requires reinstatement, even build work) completed?
-
take photos of uncompleted reinstatement and reinstate, then take photos and send to your department manager and field manager.
-
Are the depth/s of Peg/s Marker/s Correct?
-
Install Peg/s Marker/s in the correct depth (ground line on peg).
-
Is there a Enable tile marker?
-
Is the tile marker at level with the surrounding ground?
-
Reinstall the Enable tile marker to the correct level with the surrounding ground.
-
Any there any tasks waste or rubbish left on site?
-
Ensure all tasks waste on site are removed before leaving site.
-
Any Feedback from the End-customer?
-
Please list the feedback, and request if the customer can send the feed back to cvfibre@gmail.com
Quality Assurance Snap Shot
-
Please list good quality workmanship
-
Please add good quality workmanship photos
-
Please list bad quality and non-compliant workmanship.
-
Please add bad quality and non-compliant workmanship photos
-
Discussion and immediate rectification/s required?
-
Add photos of rectification
-
Future Improvements / Training done on site?
Acknowledgement
-
Manager/Auditor Name
-
Add signature
Technician
-
Name
-
Add signature