Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Administration
-
Project site orientations up to date
-
Subcontractors submitting JHA forms daily
-
Subcontractor meetings being held weekly
-
Pre Construction meeting being held with documentation
-
Northstar Safety program manual on site
-
Northstar SDS book on site
-
Northstar eye wash station on site and useable
-
Northstar first aid kit on site and stocked
-
Northstar project team has valid CPR and first aid training
Project Postings
-
Project team phone numbers posted
-
Emergency phone numbers posted
-
Directions to hospital and minor emergency care facility posted
-
OSHA posters posted
-
OSHA 300 log posted
-
GHS information posted
-
Right to know station created
-
Site logistics plan created and posted
-
Emergency action plan created and posted
General Housekeeping
-
Housekeeping being done by subs
-
Clean up being performed by composite crew
-
Project site clean and organized
-
Trip hazards being identified and corrected
-
Lay down yard organized
-
Worker parking organized and adequate
-
Proper access to work area
Public protection
-
Security system / Site security implemented
-
Barricades installed properly
-
Street closures identified
-
Excavations protected
-
Perimeter project fencing and signage package installed
-
Danger high voltage signs posted '
-
Equipment windshields are free of defects
-
Traffic control plan created/submitted
Motorized equipment
-
Operators using seat belt
-
Operator appears to be qualified
-
Operator training documentation onsite
-
Fire extinguishers inspected and present
-
Back-up alarm properly functioning
Earthwork
-
Fuel on site been permitted
-
All hoses free of leaks and defects
-
Fuel on site properly stored and containment measures installed
-
Does equipment have fire extinguishers
-
Dust control being maintained
-
Equipment and ground worker separation being maintained
-
Fire Lanes/road being cleaned/no mud on streets
-
Housekeeping being done
-
Proper equipment to comply with Silica
Utilities/trench safety inspection
-
Spill kits on site and readily available
-
Daily inspections being performed
-
Perimeter protection at excavations installed properly
-
Excavations shored/sloped or benched properly
-
Access within 25' of workers
-
Spoils at a minimum 2' from excavation
-
Surface encumbrances removed
-
Excavation free of water
-
Excavation exceeding 20', shoring must be engineered
-
Surface traffic exposure identified and removed
-
One call system being used
-
Housekeeping being done
Concrete
-
Eye protection being used, when appropriate
-
Ear protection being used, when appropriate
-
Is proper protection being used for silica exposure
-
No free rigging being used on project
-
Safety glasses and face shields being used when cutting rebar
-
Safe access to grade beams created
-
Fire extinguishers on equipment
-
No dry cutting
-
Curing compounds properly stored and used
-
Housekeeping begin done
-
Proper equipment to comply for Silica
Cranes and Hoisting
-
Annual 3rd party crane inspection performed
-
Operator NCCCO trained and current
-
Boom angle indicator visible
-
Anti two block device working properly
-
Crane leveled properly on firm footings / Outrigger pads
-
Fire extinguisher in cab present
-
Daily inspections current
-
Flag man identified
-
Load chart/owners manual present
-
Riggers been identified
-
Rigging being inspected
-
Housekeeping being done
Steel Erection
-
Steel erection plan submitted and approved <br>
-
Steel erection plan being followed
-
Back up alarms working on all equipment
-
Gauges on torches working properly
-
Flashback arrestors installed on torches
-
Harness's being worn correctly
-
No free rigging being performed
-
Lifts being used on level surfaces
-
Bottles upright/properly separated
-
Acytelene/oxygen caps installed when not in use
-
Fire blankets on site,used when needed
-
Annual 3rd party crane inspection performed
-
Fall protection system in place
-
Is dunnage being removed
-
Housekeeping being done
-
Gates/chains on lifts being used
-
Welding leads in proper condition
Drywall/Framing
-
Standing surfaces on lifts,clean,no debris
-
Acytlene and oxygen gauges in proper working condition
-
"Laser in use" signs being posted
-
Back up alarms working properly
-
Fire extinguishers on equipment
-
Proper use of ladder
-
Ladder inspected
-
Scaffold bracing and pins installed
-
Scaffold inspected and tagged
-
Fall protection being used
-
Hilti gun in proper working order
-
Extension cords & screw guns/chop saws being inspected daily
-
Housekeeping being done
-
Safety glasses and face shields being used when required
Masonry
-
Toe boards properly installed
-
Walk boards properly installed
-
Footing boards properly installed and footings leveled
-
Scaffold tied off to structure if required
-
Safety railing installed at each end of walk boards inspection
-
Fire extinguisher on equipment
-
Is the proper equipment being used for silica exposure
-
Nuisance masks being used, when required
-
Masonry wall bracing plan submitted
-
Dry sawing not being performed
-
Masonry walls braced properly
-
Proper access provided to mixing station
-
All equipment guards in proper condition to manufacturing guidelines
-
Hand tools in good condition
-
Face shield been used while using porta saw
-
Housekeeping being done?
-
Proper equipment to comply with Silica
Electrical
-
Proper access on scaffold provided
-
Temporary electrical in proper condition
-
Eye protection being used, when required
-
Building minimum 8 foot candles
-
Electrical rooms locked when not in use
-
Ladders inspected daily
-
Fire extinguishers on equipment
-
Qualified electrician in electrical room when in use
-
Back up alarms working on equipment
-
No hot work being performed
-
Gates/chains being used on scissor lifts
-
Eye protection worn when required
-
LOTO being implemented
-
Fall protection being used?
-
Housekeeping being done
-
Proper equipment to comply with Silica
Mechanical/Plumbing
-
Ladders inspected daily
-
Is ladder being used correctly
-
Extension cords grounded,no cuts
-
Task fire extinguishers being used
-
Flash back arrestors on torch bottles
-
Back up alarms working on equipment
-
Fire extinguishers on equipment
-
LOTO being implemented
-
Fall protection system in place
-
Proper equipment to comply with Silica
-
Housekeeping being done
Glazing
-
Fire extinguishers on equipment
-
Laser in use signs posted
-
Ladders being used properly
-
Ladders inspected
-
Back up alarms working on equipment
-
Housekeeping being done
-
Proper work platforms being utilized
Roofing
-
Parapet heights identified on plans
-
Kettle 15' away from building and fencing installed
-
Kettle operator has proper clothing and eye protection
-
Controlled access zone implemented under (Hot Tar) work areas
-
P.P.E. Being used as required
-
Skytrack for loading material has outriggers
-
Control access zone in place
-
Fire extinguishers on sky tracks
-
Housekeeping being done
Painting
-
Back up alarms working on equipment
-
Air hoses in proper working order
-
Electrical cords inspection
-
Materials/rags being stored properly
-
Safety glasses being worn when required(texturing etc.)
-
Nuisance mask being worn when sanding
-
Harness being worn properly
-
No flammables being stored in building
-
Proper use of ladders
-
Nuisance masks being worn when sanding floors
-
Housekeeping begin done?
-
Ladder inspection
-
Proper equipment to comply withSilica
-
Man lifts begin used correctly
Confined Space
-
Confined space permit required
-
Atmospheric conditions being monitored
-
Rescue plan submitted
-
Extraction equipment provided
-
Confined space entry posted with signage
-
Communication plan created and implemented
-
Ventilation required
-
Extraction equipment provided
-
Confined space training provided
Northstar equipment inspections
-
Bobcat/ATV/Street sweepers being inspected daily
-
Equipment operator qualified ?
-
Proper fire protection implemented
-
Back up alarms working?
-
All belts/hoses free of defects ?
-
Seat belts/fire extinguishers on equipment and inspected?
-
Tires and tracks in good shape?
-
Regular maintenance scheduled?
-
Housekeeping of machines being done
Silica compliance
-
Subcontractor have PPE
-
Subs have equipment Hepa filter
-
Silica program on site
-
Subs using the proper equipment
-
Proper equipment to comply with Silica
-
Housekeeping been done
Misc. Issues
-
Housekeeping been done
-
Guardrails in place
-
Open holes covered
-
Fire extinguisher in right locations<br>
-
Fire extinguisher begin inspected
-
Fall protection in place
-
Proper use of ladders
Mill work
-
Equipment in working order
-
Equipment guards in place
-
Cords in good shape
-
Proper PPE begin use
-
Competent person on site to inspect scaffolding
-
Proper use of scaffolding
-
Proper use of ladders
-
Ladders been inspected
Fire sprinkler
-
Threader machine in goodshape
-
Ladder used properly
-
Ladder inspected
-
Housekeeping begin done
-
Cords in good shapes
Carpenters form work
-
Face shield being used when grinding
-
Equipment being inspected
-
Housekeeping
-
Ladders being used correctly
-
Nail removed from forms
-
Dust mask, ear plugs used when grinding
-
Fall protection being used
-
Ladders built correctly