Title Page
-
Conducted on
-
Prepared by
-
Location
Open DM
-
Add signature
-
Have the lights and aircon been turned on?
-
Have you let the lifeguard into the facility?
-
Do you have a bumbag, oxygen mask and a set of disposable gloves?
-
Ensure you and the LG have a whistle
-
Ensure you, the LG and CSO all have a working radio on the same channel (default channel 1)
-
Are manual pool tests compliant?
-
Have you dosed the pool accordingly?
-
Have you recorded the results in IMS?
-
Ensure the lifeguard is completing open duties<br>- Remove pool vac<br>- Remove pool blankets<br>- Allocate squad lanes
-
Turn on till 1 computer and open LINKS<br>ID & Password: 1864
-
Open safe and count float into till 1
-
Do a quick visual inspection of the health club and ensure pool is ready to open
-
Ensure CSO has arrived
-
Have you checked Lane Allocation?
-
Ensure the LG has completed opening procedures
-
Ensure the CSO has completed opening procedures
-
Open facility to public
-
Record automated plant readings in IMS
-
Complete the Daily Facility Inspection
-
Any maintenance or OH&S to report? If yes, please detail with notes and a photo
-
Have you notified the Aquatics Coordinator by email?
-
8AM change room checks
-
Polish all stainless steel
Morning DM
-
Have you completed the 9AM pool test and entered the results in IMS?
-
Have you checked the plant room and entered results in IMS?
-
10AM change room checks
-
Add signature
-
Do you have a bumbag, oxygen mask and a set of disposable gloves?
-
Do you have a working radio and whistle?
-
Send an opening reminder to ALL open staff tomorrow
-
Full facility spot clean
-
Tidy up the storeroom
-
Clean out the pool vacuum
-
Are poolside windows clean?
-
Have you cleaned the windows?
-
Sweep bench seats
-
Hose, scrub and rinse pool tiles deep end
-
12PM change room checks
-
Have you completed the 12PM pool test and entered the results in IMS?
-
Have you checked the plant room and entered results in IMS?
Close DM
-
Add signature
-
2PM change room checks
-
Scrub the deep end blocks
-
Wipe down the wall tiles lane 8 side
-
Full facility spot clean
-
Have you completed the 3PM pool test and entered the results in IMS?
-
Have you checked the plant room and entered results in IMS?
-
Prepare the pool vacuum to go into lane 8
-
Notify all patrons over the PA @ 3.30PM<br>"Good Afternoon, this is a friendly reminder that the facility will be closed at 3.45, please start making your way to the changing rooms."
-
Has the LG cleared the pool by 3.30PM?
-
Close the main entrance door with the sign inside
-
Remove the regulator from the oxygen bottle
-
Help CSO with money handling
-
Place all money in the safe and lock it
-
Ensure the LG has completed closing procedures
-
Ensure the CSO has completed closing procedures
-
Ensure radios are switched off and placed on charge
-
Sign off on TimeTarget and exit facility with all staff