Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Scaffold built to scope

  • Has a scope of work been supplied to work group<br><br><br><br>

  • Has the scaffold been completed to the clients supplied scope.

  • We're there any significant problems in performing the required scope

Scaffold built to standard

  • Have base plates been uesd

  • Are ladders 4 to1 and in good order?

  • Are kick boards present and correct height?

  • Is the structural design of the scaffold sufficient for the task to be performed

  • Is the access way clear of obstructions

  • Has the scaffold been tied in accordingly to its height and width

  • Is the scaffold deck clear of trip hazards, holes and secured to standards

  • Has bracing been used to standard

  • Has a scaffold tag been placed on scaffold and is clearly visibleu

  • Has the scaffold tag been filled out correctly with all relevant information

  • Have sole boards been used

Work group safety

  • Is the scaffold blocking any access ways

  • Is the scaffold blocking any safety showers or eye wash stations

  • Have any protruding tubes, clip bolts or other objects that may create a catch point been adequately Protected

  • Can the scaffold be a hazard for mobile equipment

  • Add signature

  • Add media

  • Gear list of completed scaffold

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.