Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Scaffold built to scope
-
Has a scope of work been supplied to work group<br><br><br><br>
-
Has the scaffold been completed to the clients supplied scope.
-
We're there any significant problems in performing the required scope
Scaffold built to standard
-
Have base plates been used
-
Are ladders 4 to1 and in good order?
-
Are kick boards present and correct height?
-
Is the structural design of the scaffold sufficient for the task to be performed
-
Is the access way clear of obstructions
-
Has the scaffold been tied in accordingly to its height and width
-
Is the scaffold deck clear of trip hazards, holes and secured to standards
-
Has bracing been used to standard
-
Has the scaffold tag been filled out correctly with all relevant information
-
Has a scaffold tag been placed on scaffold and is clearly visible
-
Have sole boards been used
Work group safety
-
Is the scaffold blocking any access ways
-
Is the scaffold blocking any safety showers or eye wash stations
-
Have any protruding tubes, clip bolts or other objects that may create a catch point been adequately Protected
-
Can the scaffold be a hazard for mobile equipment
-
Add signature
-
Add media