This is a GRT quality assurance check form. This will be completed after every handover of scaffolding. Photos must be included of every elevation. This protects you as a scaffolder.

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Plot

  • Plot number of scaffolding. If joined plots, list all numbers.

  • Lift of scaffolding (1st, 2nd lift etc)

  • Independent Scaffolding

  • Birdcage handover?

  • Propping handover?

  • Loading bay hand over?

  • Side on loading bay?

  • Notes. Any area that something that the client needs to be aware of.

  • Any variation that needs to be raised. Make more notes in the note section.

Conformation signature.

  • BY signing this form, you confirm that the scaffolding has been inspected and is fit for purpose and is suitable for the clients needs.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.