This is a GRT quality assurance check form. This will be completed after every handover of scaffolding. Photos must be included of every elevation. This protects you as a scaffolder.
-
Site conducted
-
Photo of hand over certificate.
-
Conducted on
-
Prepared by
-
Location
Plot
-
Plot number of scaffolding. If joined plots, list all numbers.
-
Lift of scaffolding (1st, 2nd lift etc)
-
Independent Scaffolding
-
Birdcage handover?
-
Propping handover?
-
Loading bay hand over?
-
Side on loading bay?
-
Notes. Any area that something that the client needs to be aware of.
-
Any variation that needs to be raised. Make more notes in the note section. Add photo also.
Conformation signature.
-
BY signing this form, you confirm that the scaffolding has been inspected and is fit for purpose and is suitable for the clients needs.